Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date5 Nov 2024
Closing Soon21 Nov 2024
Tender Amount₹ 72,40,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm -11.2 mm aggregates using penetration grade bitumen VG-10 to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant,laying and rolling with three wheel static roller 80-100 KN capacity ,finished to required level and grades to be follwed by seal coat of Type -C as per Technical Specification Clause 508.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

8550

159

1359450

... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

8550

58

495900

... More
Construction of Subgrade and earthen shoulders with approved material obtained from borrow pits with all lift and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 303.1 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

1026

61

63099

... More
PART B Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024 . Maintainance cost will adjusted as per final cost of construction and will be paid accordingly. (from serial number 1 to 6 )

1

-

-

... More
1st year- maintainance cost 0% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

1

-

-

... More
2nd year- maintainance cost 1.5% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

1

36030

36030.28

... More
3rd year- maintainance cost 3 % on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

1

72060

72060.57

... More
4th year- maintainance cost 4.50% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

1

108090

108090.86

... More
5th year- maintainance cost 6 % on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

1

144121

144121.14

... More
Providing, laying, spreading and compacting of sukrut stone stone aggregates of specific sizes(22.4-53mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber,applying and brooming ,binding materials to fill-up the interstices of coars aggrigate,watering and compacting to the required density Grading-3 as per Technical Specification clause 405.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

67.5

2250

151875

... More
Construction of un reinforced plain cement concrete pavement, thickness as per design over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 M30(Grade) coarse and fine aggregates confoming to IS:383 maximum size of coarse aggreagate not exceeding 25 mm mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design laid in approved fixed side formwork (steel channel laying and fixing of 125 micron thick polythene film wedges steel plates including levelling the formwork as per drawing) spreading the concrete with shovels rakes compacted using needle screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints and near aapproaches and construction joints admixtures as approved curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. As direction by the E/I, (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

202.5

7250

1468125

... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with equirements of lines, grades and cross-sections, with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

359

19

7108.2

... More
Construction of Subgrade and earthen shoulders with approved material obtained from borrow pits with all lift and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 303.1 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

216

61

13284

... More
Plain Cement Concrete (PCC) M-10(1:3:6 Nominal Mix) in open foundation complete as per drawing and techanical specification Clause 802,803,1202 & 1203. (Including all taxes, labour cess, T&P and material but Excluding GST)

55.25

4880

269620

... More
Rainforced Cement Concrete (RCC) M-20 in open foundation complete as per drawing and techanical specification Clause 802,803,1202 & 1203. (Including all taxes, labour cess, T&P and material but Excluding GST)

129.5

6600

854700

... More
Supplying fitting and placing TMT bar reinforcement in foundations complete as per drawing and specification Clausees 1002,1010 & 1202.(Including all taxes, labour cess, T&P and material but Excluding GST)

108.8

6350

690880

... More
R.C.R with cement and coarse sand mortar in proportion of 1 and 4 respectively in foundation complete as per drawing and technical specifications Clause 600, 1202 & 1203 (Including all taxes, labour cess, T&P and material but Excluding GST)

56

4200

235200

... More
R.C.R with cement and coarse sand mortar in proportion of 1 and 4 respectively in sub structure complete as per drawing and technical specifications Clause 600, 1202 & 1203 (Including all taxes, labour cess, T&P and material but Excluding GST)

34

4400

149600

... More
Providing concrete for reinforced concrete (M-25) in super-structure complete as per drawings and technical specifications Clauses 802,803,1202 & 1203 (Including all taxes, labour cess, T&P and material but Excluding GST)

8.35

8040

67134

... More
Rainforced Cement Concrete (RCC) M-20 in open sub-structure complete as per drawing and techanical specification Clause 802,803,1202 & 1203, for wearing coat or coaping. (Including all taxes, labour cess, T&P and material but Excluding GST)

1.18

6940

8189.2

... More
Struck pointing with cement mortar consisting of 1 part cement and 2 parts of sand of 1.25 FM including Supply of all material , labour T&P etc required for proper completion of work.As per SOR SI No-574. (Including all taxes, labour cess, T&P and material but Excluding GST)

43.8

185

8103

... More
PART B Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024. Maintainance cost will adjusted as per final cost of construction and will be paid accordingly. (from serial number 08 to 19)

1

-

-

... More
1st year- maintainance cost 0% CC & Drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

1

-

-

... More
2nd year- maintainance cost 0.25 % CC & Drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

1

9809

9809.55

... More
3rd year- maintainance cost 0.5 % CC & Drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

1

19619

19619.09

... More
4th year- maintainance cost 0.75 % CC & Drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

1

29428

29428.64

... More
5th year- maintainance cost 1 % CC & Drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

1

39238

39238.18



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.