If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date5 Aug 2023
Closing Date17 Aug 2023
Tender Amount₹ 1,04,00,000
Costs
EMD
₹ 7,20,000Document Cost
₹ 2,360Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_CEUCZ_826829_1Bid Award Id
ViewTender No
5168/401C-LKOCIR/2023-24 DATED 22.07.2023Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of granular sub-base by providing well graded material from shankargarh quarry, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401 complete in all respects.(Including all material, labour & T&P with all taxes complete but excluding GST)
610
1988600
3260
... More
Providing ,Laying ,spreading and compacting stone aggregates from shankargarh quarry of 63-45 mm size to water bound macadam specification including spreading in uniform thickness , hand packing ,rolling with Smooth wheel roller 80-100 KN in stages to proper grade and camber ,applying and brooming ,Stone screening,binding materials to fill up theinterstices of coarse aggregate ,watering and compacting to the required density.Grading-II as per Mord spe no 405 complete in all respects. (Including all material, labour & T&P with all taxes complete but excluding GST)
526
2072440
3940
... More
Providing ,Laying ,spreading and compacting stone aggregates from shankargarh quarry of 53-22.4 mm size to water bound macadam specification including spreading in uniform thickness , hand packing ,rolling with Smooth wheel roller 80-100 KN in stages to proper grade and camber ,applying and brooming ,Stone screening to fill up the nterstices of coarse aggregate ,watering and compacting to the required density.Grading-III as per Mord spe no 405 complete in all respects. (Including all material, labour & T&P with all taxes complete but excluding GST)
506
1980990
3915
... More
Brick edging on both sides of the road with first class bricks 8 cm wide & 12 cm deep laid with mudmortar including labour & supply of bricks finished to required template and in proper alingment and also including dressing & ramming the excavated earth as directed by the Engineer - in -charge.
1.8
140400
78000
... More
Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mannual means as per Mord spe no 502 complete in all respects. (Including all material, labour & T&P with all taxes complete but excluding GST)
6750
263250
39
... More
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.35 kg per sqm on the prepared surface cleaned with hydraulic broom as per Mord spe no 503 complete in all respects. (Including all material, labour & T&P with all taxes complete but excluding GST)
6750
111375
16.5
... More
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates from kabai quarry with using VG-10 @ 1.46 per sqm bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing with suitable hot mix plant, laying with paver and rolling with a smooth wheeled roller, finished to required level and grades. as per Mord spe no 508 complete in all respects. (Including all material, labour & T&P with all taxes complete but excluding GST)
6750
1161000
172
... More
Providing and laying seal coat composed of 6.7mm size aggregate from Kabrai quarry with using VG_10@0.65 Kg per Sqm bitumen to required sealing the voids in a bituminous surface laid to the specified levels, grade and crossfall using Type-C.as per morth spe no 510 complete in all respects. (Including all material, labour & T&P with all taxes complete but excluding GST)
6750
394875
58.5
... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 daystechnical speficiations clauses 600, 1202 & 1203 complete in all respects. (Including all material, labour & T&P with all taxes complete but excluding GST)
3
20850
6950
... More
Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600, 1202 & 1203 complete in all respects. (Including all material, labour & T&P with all taxes complete but excluding GST)
6.2
40610
6550
... More
Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification clauses 613.3 , 1204 and 1208.4 complete in all respects. (Including all material, labour & T&P with all taxes complete but excluding GST)
24
1788
74.5
... More
Providing,laying and fixing of reinforced concrete pipe 600 mm dia NP3 for culvert on first class bedding of granular material in single row with cement mortar1:2(1cement: 2 coarse sand) [as per MORD specification no. 9.3-1100(B)] complete in all respects. (Including all material, labour & T&P with all taxes complete but excluding GST)
7.5
27000
3600
... More
Providing,laying and fixing of reinforced concrete pipe 350 mm dia NP3 for culvert on first class bedding of granular material in single row with cement mortar1:2(1cement: 2 coarse sand) [as per MORD specification no. 9.3-1100(B)] complete in all respects. (Including all material, labour & T&P with all taxes complete but excluding GST)
15
24000
1600
... More
Maintenance of Constructed road for next five year after completion the work contractor shall be paid maintenance cost for five year in the form of installement as below. Payment shall be done as per satisfaction of Eng-in-charge regarding maintenance work carried out by contractor. (Including all material, labour & T&P with all taxes complete but excluding GST) For II year
1.8
93084
51713.88
... More
Maintenance of Constructed road for next five year after completion the work contractor shall be paid maintenance cost for five year in the form of installement as below. Payment shall be done as per satisfaction of Eng-in-charge regarding maintenance work carried out by contractor. (Including all material, labour & T&P with all taxes complete but excluding GST) For III year
1.8
186169
103427.76
... More
Maintenance of Constructed road for next five year after completion the work contractor shall be paid maintenance cost for five year in the form of installement as below. Payment shall be done as per satisfaction of Eng-in-charge regarding maintenance work carried out by contractor. (Including all material, labour & T&P with all taxes complete but excluding GST) For IV year
1.8
279254
155141.63
... More
Maintenance of Constructed road for next five year after completion the work contractor shall be paid maintenance cost for five year in the form of installement as below. Payment shall be done as per satisfaction of Eng-in-charge regarding maintenance work carried out by contractor. (Including all material, labour & T&P with all taxes complete but excluding GST) For V year
1.8
372339
206855.51