Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date20 Dec 2024
Closing Date28 Dec 2024
Tender Amount₹ 5,36,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying dense graded bituminous macadam Grading-II (Kabrai quarry) (50mm thick) with higher capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent (VG-40) by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 B complete in all respects. including royality, bitumen & labour cess. GST shall be paid extra as applicable at the time of payment.

2663

-

-

... More
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared granular surface cleaned with mechanical broom. as per MORT&H specification clause no 503. including bitumen & labour cess. GST shall be paid extra as applicable at the time of payment.

102200

-

-

... More
Providing and laying bituminous concrete Grading-II (Kabrai quarry) (30mm thick) with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent (VG-40) of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 B complete in all respects. including royality, bitumen & labour cess. GST shall be paid extra as applicable at the time of payment.

1533

-

-

... More
Part-B Routine Maintenance Amount after completion of Construction works done (Amount for 5 Years)

-

-

-

... More
1st year Maintainance Charge NIL on Total actucal work done Amount of iteam 1 to 6, for repairing of Painted surface, embankment, Patri, Culvert, Road Furniture etc as per attached SOP and Direction of E/I from the actual completion of work. (Total Length 7.300 Km)

1

-

-

... More
2nd year Maintainance Charge 0.25% on Total actucal work done Amount of iteam 1 to 6, for repairing of Painted surface, embankment, Patri, Culvert, Road Furniture etc as per attached SOP and Direction of E/I from the actual completion of work. (Total Length 7.300 Km)

1

-

-

... More
3rd year Maintainance Charge 0.50% on Total actucal work done Amount of iteam 1 to 6, for repairing of Painted surface, embankment, Patri, Culvert, Road Furniture etc as per attached SOP and Direction of E/I from the actual completion of work. (Total Length 7.300 Km)

1

-

-

... More
4th year Maintainance Charge 0.75% on Total actucal work done Amount of iteam 1 to 6, for repairing of Painted surface, embankment, Patri, Culvert, Road Furniture etc as per attached SOP and Direction of E/I from the actual completion of work. (Total Length 7.300 Km)

1

-

-

... More
5th year Maintainance Charge 1.00% on Total actucal work done Amount of iteam 1 to 6, for repairing of Painted surface, embankment, Patri, Culvert, Road Furniture etc as per attached SOP and Direction of E/I from the actual completion of work. (Total Length 7.300 Km)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.