Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date14 Nov 2024
Closing Soon23 Nov 2024
Tender Amount₹ 29,00,000
Costs
EMD
₹ 2,90,000Document Cost
₹ 854Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUFZ_973720_11Tender No
1312/Nivida/24 dated 05.11.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5m. (5fts.) and lead upto 30m. (100fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-incharges upto a distance of 30m. (100 fts.) from the foundation trenches.
65
125
8125
Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. As per SI 280
12
6660
79920
Class-150 brick work in 1:4 Cement and coarse sand mortar infoundation and plinth including supply of all materials, labour and tools and plants,etc ,required for proper completion of the work. As per SOR 305b
20
5390
107800
Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) including supply of all materials, labour and tools and plants,etc ,required for proper completion of the work SI 279b
1.5
7350
11025
12 mm thick cement plaster with cement, mortar of 1:3 cement & coarse sand of 2.25 fm .As per SI 583
150
190
28500
R.C.C. work with cement approved coarse sand and 2cm (3/4'') gauge approved srone ballast in the proportion 1:1.5:3 (1Cement: 1.5 coars sand 3 aggregate) in slab excluding supply of reinforcement and its bending but including its fixing and binding the same necessary with 24BWG binding wire and including necessary centering and shuttering etc. and also including supply of materials labour and tools and plants etc. required for proper completion of the work, SI N0 284b
3
8650
25950
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & over lapping & hooks.SI 504
0.2
7500
1500
Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming stone dust to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical Specification Clause 405.(For PC Portion)
22
4400
96800
Providing and applying tack coat with BitumenVG-10 using bitumen distributor at the rate of 0.25 kg. per Sqm on the prepared old nonbituminous surfaces treated with Hydraulic broom as per Technical Specification Clause 503 also including cost of bitumen , labour T&P etc. required for proper completion of the work as per direction by Engineer In charge.
4800
12
57600
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness compesed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be following by Seal Coat of either Type-C as per Technical Specification Clause 508 Mord.
4800
206
988800
Providing and laying Seal Coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 Mord
4800
72
345600
Earth work in embankment and Patri in ordinary soil, including lift upto 1.5 mt and lead upto 30 mtr and also including ramming and dressing the surface to required level and slope as per direction of E/I.
700
110
77000
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 1st Year Maintenance cost (0.00% on Civil Cost item no 1 to 10)
1
-
-
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 2nd Year Maintenance cost(0.25% on Civil Cost item no 1 to 10)
1
2419
2419
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 3rd Year Maintenance cost(0.50% on Civil Cost item no 1 to 10)
1
4839
4839
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 4th Year Maintenance cost(0.75% on Civil Cost item no 1 to 10)
1
7258
7258
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 5th Year Maintenance cost(1.00% on Civil Cost item no 1 to 10)
1
9678
9678
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 1st Year Maintenance cost (0.00% on Civil Cost item no 11 to 15)
1
-
-
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 2nd Year Maintenance cost(1.50% on Civil Cost item no 11 to 15)
1
23487
23487
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 3rd Year Maintenance cost(3.00% on Civil Cost item no 11 to 15)
1
46974
46974
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 4th Year Maintenance cost(4.50% on Civil Cost item no 11 to 15)
1
70461
70461
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 5th Year Maintenance cost(6.00% on Civil Cost item no 11 to 15)
1
93948
93948
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%