Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date28 Dec 2024
Closing Date28 Jan 2025
Tender Amount₹ 85,00,000
Costs
EMD
₹ 6,25,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUFZ_987254_2Tender No
8540/1KAM(BARA)E-Tender/2024 Date 19-12-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Supply of 900 mm dia NP-3 S&S hume pipe for diversion work
40
5500
220000
... More
First class brick on edge floor laid dry joints sand filed including preparation of base to proper slope and its ramming and including supply of all materials, labour and T&P etc. required for proper completion of the work. (SI. No.-615)
300
600
180000
... More
Earth work in excavation of foundation of structures as per drawing and technical specification clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with suitable material,
504
100
50400
... More
Sand filling in plinth under floors including watering, ramming, consolidating and dressing complete including lead upto 50 m and lift upto 1.50 m including cost of sand.
50
1200
60000
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
33
8500
280500
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MoRD RCC grade M-25
44
10100
444400
... More
Providing concrete for plain/reinforced concrete in Sub Structure complete as per drawings and technical specifications Clause 802, 804, 805, 806, 807 and 1202 & 1204 of MoRD RCC grade M-25
85
10700
909500
... More
Providing and laying reinforced cement concrete in Superstructure complete as per drawings and technical specifications Clause 800, 1205.4 and 1205.5 of MoRD RCC grade M-25
30
10800
324000
... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
27.3
75000
2047500
... More
Providing, fitting and placing Drainage Spouts complete as per drawing and Technical specification. 2705.
48
3400
163200
... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3
14
10900
152600
... More
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification
45
4100
184500
... More
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications
90
4000
360000
... More
Excavation in Foundation Soil (loam clay or sand) including lift upto 1.5 mtr and lead upto 30 Mtr & including filling, watering, ramming of excavated earth into the ytrenches or into the plinth and removal of surplus earth as directed by Engineer in Charge upto a distance of 30 mtr from the foundation of trenches.
177
140
24780
... More
Providing and laying in cement concrete 1:4:8 (1 Cement : 4 C/ Sand : 8 40 mm nominal size stone ballast) and curing complete, including cost of form work in foundation and floors. Including supply of all materials, labour, T&P etc complete.
22
4200
92400
... More
Class 150 brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour tools and plants, etc, Required for proper completetion of the work.
147
5600
823200
... More
Pointing with cement mortar (1:2) on brickwork in sub structure & super structure as per drawing and technical specification clause si 574
332
210
69720
... More
2.5cm thick 1:2:4 plain cement concrete floor with cement approved coarse sand and 2cm graded approved stone laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in 5:1 as specified over giving them a uniform finish including supply of all materials, labour and T&P etc. required for proper completion of work
542
325
176150
... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
48.78
4500
219510
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Three wheel Static roller 8-10 tonnes in stages to proper grade and camber, applying and brooming crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical specification clause 405
28.22
5100
143922
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Three wheel Static roller 8-10 tonnes in stages to proper grade and camber, applying and brooming crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical specification clause 405.
28.22
5300
149566
... More
Providing and applying primer coat with bitumen emulsion( SS-1) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical specifications Clause 502
376.25
38
14297.5
... More
Providing and applying tack coat with bitumen VG-10 at the rate of 0.35 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
376.25
19
7148.75
... More
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades to be followed by a seal coat of either Type c as per technical Specification clause 508
376.25
200
75250
... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510
376.25
70
26337.5
... More
Brick edging on both side of road of 1st class brick 8 cm. (3") wide and 12 cm. (4.5) deep laid with mud mortar all labour finished to the required template and in proper alignment and also including dressing and ramming the excavated earth including all labour, T&P sudries required for proper completion of work material.
0.05
82000
4100
... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 mad of high intensity grade sheeting vide clause 801.3, fixed cover aluminium shting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x75 mm x6 mm firmly fixed to th ground by means of properly dsignd foundation with M-15 grade cment conc. 45 cm x 45 cm x 60 cm, 60 cm below ground lvel as per approved drawing HAZARD MARKER (LEFT)
12
4877
58524
... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 mad of high intensity grade sheeting vide clause 801.3, fixed cover aluminium shting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x75 mm x6 mm firmly fixed to th ground by means of properly dsignd foundation with M-15 grade cment conc. 45 cm x 45 cm x 60 cm, 60 cm below ground lvel as per approved drawing (SPEED BREAKER) RUMBLE STRIP
8
6138
49104
... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 mad of high intensity grade sheeting vide clause 801.3, fixed cover aluminium shting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x75 mm x6 mm firmly fixed to th ground by means of properly dsignd foundation with M-15 grade cment conc. 45 cm x 45 cm x 60 cm, 60 cm below ground lvel as per approved drawing (SPEED LIMIT)
8
4971
39768
... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 mad of high intensity grade sheeting vide clause 801.3, fixed cover aluminium shting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x75 mm x6 mm firmly fixed to th ground by means of properly dsignd foundation with M-15 grade cment conc. 45 cm x 45 cm x 60 cm, 60 cm below ground lvel as per approved drawing (STOP)
8
8239
65912
... More
Providing & fixing Km stone, Hectometer stone & sign Board etc. complete
1
10000
10000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%