Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Eprocure
Opening Date14 May 2020
Closing Date8 Jun 2020
Tender Amount₹ 43,95,992 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 4,03,000Document Cost
₹ 2,415Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_CEUCZ_469498_3Bid Award Id
ViewTender No
1339/352C/E.TENDER/STP-LMP/19 Dt. 04-05-2020Tender Authority
Public Works Department ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with 2% Cement (OPC) with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
39.5
-
4425
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to wet mix macadam specification including premixing the material with water at OMC and 4% cement (OPC) in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel 80-100 KN weight to achive the desired density including lighting, barricading and maintenance of diversion, etc as per Technical Specification Clause 400.11 & 400.12 and Technical Specification Clause 406.
234
-
4890
... More
Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits availble land with all lifts and leads, spreading, grading to required slope and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specitaion Clause 303.1
585
-
85
... More
Providing and applying tack coat with Bitumen (VG-10) using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
3000
-
9.5
... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508
3000
-
156
... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510
3000
-
49.5
... More
Construction of Gule Culvert 300 mm Dia Hume pipe as per direction of Engineer in charge. 3 No. x 2.50 Mt = 7.50 RM)
2
-
13500
... More
Construction of Pipe Culvert 600 mm Dia Hume pipe as per direction of Engineer in charge. 3 No. x 2.50 Mt = 7.50 RM)
1
-
85000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements