Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date14 Nov 2024
Closing Date21 Nov 2024
Tender Amount₹ 47,99,629 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 4,40,000Document Cost
₹ 3,450Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEJNS_974067_2Bid Award Id
ViewTender No
7846/ 44 C- Jhansi Circle/2024 Date 22.10.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing laying & rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by Seal coat-C Technical Specification Clause 508.
6600
141
930600
... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grede and cross fall using Type C as per Technical Specification MORD sepecification no. Clause 510. as per Data Book item No. 5.12 (B) Case - III TypeC
6600
47
316140
... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2
572
76
43758
... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0% Construction Cost)
2.2
-
-
... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (1.5% Construction Cost)
2.2
11556
25423.2
... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (3% Construction Cost)
2.2
23112
50846.4
... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (4.5% Construction Cost)
2.2
34669
76271.8
... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (6% Construction Cost)
2.2
46225
101695
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to Water bound macadam-3 specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fillup the interstices of course aggregate, watering and compacting to the reqiured density Grading 3 as per MORD Technical Specification Clause 405
120
2455
294600
... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,
360
6714
2417040
... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 (In Abadi Portion)
396
175
69300
... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0% Construction Cost)
0.8
-
-
... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (0.25% Construction Cost)
0.8
8690
6952
... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (0.50% Construction Cost)
0.8
17380
13904
... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (0.75% Construction Cost)
0.8
26071
20856.8
... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (1% Construction Cost)
0.8
34761
27808.8