If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date10 Feb 2025
Closing Date15 Feb 2025
Tender Amount₹ 3,07,00,000
Costs
EMD
₹ 17,35,000Document Cost
₹ 2,360Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEAGR_1004383_3Bid Award Id
ViewTender No
6403/14M-AC/2024-25 dated 10-12-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing, laying spreading & compacting of granular sub-base by providing coarse graded (Gr-1) materials, spreading in uniform layers with Motor Grader on prepared surface, mixing by mix in placed method with Rotovator at OMC and compacting with in layers with smooth wheeled Vibratory Roller to achieve the desired density, complete and including all machinery charges & including all labour, T&P etc required for proper completion of the work. as directed by Engineer Incharge. As per MoRT&H clause 401(b).
1500
2870
4305000
... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC cement and 3.50% emulsion in Uniform single layer on sub base/subgrade and compacting with the road roller to achieve th desire density.
850
7175
6098750
... More
Providing & applying Tack Coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.25Kg./Sqm. on the prepared primed granular/old painted surface, cleaned with Mechanical broom, including all Taxes, Material, Labour, T&P etc required for proper completion of the work. (For DBM)
18200
13
236600
... More
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
1180
9500
11210000
... More
Providing & applying Tack Coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 Kg./Sqm. on the prepared primed granular/old painted surface, cleaned with air compressor, including all Taxes, Material, Labour, T&P etc required for proper completion of the work. (For B.C.)
18200
10
182000
... More
Providing and laying Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grade premixed with bituminous binder VG-40 @ 5.40% of mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with to the required grade, level and alignment, rolling with smooth Wheeled vibratory & Tandom Rollars to acheive the desired compaction as per MORT&H Specifications clause 509 Complete in all respects.
540
10900
5886000
... More
Excavation in foundation in ordinary soil (Loam, Clay or Sand) lncluding lift upto 1.50 m and lead upto 3Om and including filling watering and ramming of excavated eafth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer lncharge upto a distance of 30m from the foundation trenches. Mannual (Small work)
220
150
33000
... More
Providing and laying cement concrete in 1:3:6 (1 Cement: 3 coarse sand :6 gladed stone aggregate 40 mm nominal size) and curing complete, lncluding cost of form work in Foundation and floors.
30
5900
177000
... More
Providing and laying cement concrete in 1:4:8 (1 Cement:4 coarse sand :8 graded stone aggregate 40 mm nominal size) and curing complete, lncluding cost of form work. in Foundation and floors.
8
5625
45000
... More
Class-150 (Non Modula0 brick work in 1 :3 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work
60
5900
354000
... More
Class-150 (Non Modula0 brick work in 1 :4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work
30
5650
169500
... More
R.C.C. work Providing and laying in position specified grade of reinforced cement concrete, Slab including the cost of centering, shuttering, finishing and excluding reinforcement, Above plinth level upto fifth floor lable 1:1.5:3 (1 cement:1.5 coarse san
15
8700
130500
... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications.
2
79000
158000
... More
Providing and laying cement concrete in 1:1.5:3 (1Cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) and curing complete, lncluding cost of form work. ln Foundation and floors.
20
6900
138000
... More
12mm thick Cement plaster in single coat of fair side of single of half brick wall for interior plastering upto floor two level including internal rounded angles chamfers, and/or rounded angles not exceeding 80mm. In girth and finished even and smooth No.
70
200
14000
... More
Supply & laying of Granular Material (6.7 mm guage stone grit) in bedding Complete as dwawing and technical specification.
9
1631
14687.1
... More
Prwiding and Iaying 350dia NP-3 pipe RCC concrete pipe for culvert on first class in slngle row including fixing socket with cement mortar 'l:2 but excluding excavation, protection works'
backfilling, concrete and masonry works in head walls and parapets Clause 2900
30
2300
69000
... More
Prwiding and Iaying 900dia NP-3 pipe RCC concrete pipe for culvert on first class in slngle row including fixing socket with cement mortar 'l:2 but excluding excavation, protection works'
backfilling, concrete and masonry works in head walls and parapets Clause 2900
7.5
7750
58125
... More
Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 coarse sand) :Flush / Ruled / Struck or weathered pointing
95
125
11875
... More
Maintainance Charge including @ All Items total work amount etc as per Direction of E/I for the period of Five Years from the actual completion of work. (Total work amount-29946037.10)
29946037.1
-
-
... More
Maintainance of First Year
(@0.00% of Total Work Amount of item 1 to 23)
1
-
-
... More
Maintainance of Second Year (@ 0.25% of Total Work Amount of item 1 to 23)
1
-
74865.09
... More
Maintainance of Third Year (@ 0.50% of Total Work Amount of item 1 to 23)
1
-
149730.19
... More
Maintainance of Fourth Year (@ 0.75% of Total Work Amount of item 1 to 23)
1
-
224595.28
... More
Maintainance of Fifth Year (@ 1% of Total Work Amount of item 1 to 23)
1
-
299460.37
... More
Note - 1- Rates are inclusive of all taxes but excluding GST which shall be paid extra as applicable 2- Labour cess @ 1% will be deducted from contractor's bill at the time of payment 3- Maintenance (SL No. 23) will be calculated on value of actual work done.
-
-
-