Public Works Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date27 Feb 2025
Closing Date6 Mar 2025
Tender Amount₹ 32,06,000
Costs
EMD
₹ 3,21,000Document Cost
₹ 860Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEMRZ_1011591_1Tender No
385/6A DATE-10.02.2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Manual Means. MORD 4.7(3) (A)
196.88
2360
464636.8
... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. MORD 5.1(i)
2625
47
123375
... More
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 kg. per sqm on the prepared granular surface treated with primer cleaned with hydrulic broom as per Techinical Specification No.503 MORD 5.2(iii)
2625
16
43312.5
... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen (VG-10) to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. By Manual Means (Including Cost of Bitumen) MORD 5.9 Case-I(i)
2625
171
450187.5
... More
Providing and laying seal coat with Bitumen (VG-10) sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510. By Manual Means (Including Cost of Bitumen) MORD 5.2 Case-III(i)
2625
63
166687.5
... More
Earthwork in excavation in ordinary soil for structures as Per drawing and techanical specification clause 305 including setting out, construction of shoring and bracing, removal of stumps and other deleterous material and disposal up to a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material. MORD 11.1-I(i)
13
300
3900
... More
Providing concrete for plain/reinforced concrete in open foudation complete as per drawing and techanical specification clauses 802,803,1202 and 1203. PCC grade (M-10) Nominal Mix 1:3:6 MORD 11.4-I(i)
1.8
5465
9837
... More
Stone masonary work in cement mortor(1:4) in foundation complete asper drawing and techanical specification clauses 702,704,1202 and 1203 Course rubble masonry (2nd sort). MORD 11.6(9)
11.5
4415
50772.5
... More
S/O 600mm Dia. NP-3 hume pipe inc. its cost T&P etc. complete.
7.5
3200
24000
... More
Laying and jointintg 600mm Dia. NP-3 pipe its position asper drawing inc. all material labour T&P etc complete.
3
400
1200
... More
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204 MORD 12.2
17.5
70
1225
... More
Plastering with cement mortar (1:3), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 MORD 12.3
3.3
212
699.6
... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. MORD 3.14
800
121
96800
... More
The routine maintenance of above road work including embankment, patri, pavement, hume pipe culvert to the required standards and in the manner as defined in C.B. Condition and keep the entire road surpace and structure in Defeft free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) For 1st Year Maintenance cost (0%)
0.7
-
-
... More
The routine maintenance of above road work including embankment, patri, pavement, hume pipe culver o the required standards and in the manner as defined in C.B. Condition and keep the entire road surpace and structure in Defeft free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) For 2nd Year Maintenance cost (1%)
0.7
31857
22299.9
... More
The routine maintenance of above road work including embankment, patri, pavement, hume pipe culvert to the required standards and in the manner as defined in C.B. Condition and keep the entire road surpace and structure in Defeft free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) For 3rd Year Maintenance cost (1.5%)
0.7
63714
44599.8
... More
The routine maintenance of above road work including embankment, patri, pavement, hume pipe culvert to the required standards and in the manner as defined in C.B. Condition and keep the entire road surpace and structure in Defeft free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) For 4rth Year Maintenance cost (2%)
0.7
95571
66899.7
... More
The routine maintenance of above road work including embankment, patri, pavement, hume pipe culvert to the required standards and in the manner as defined in C.B. Condition and keep the entire road surpace and structure in Defeft free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) For 5thYear Maintenance cost (3%)
0.7
127429
89200.3
Evaluation Notes How It Works ?
Potential Partner