Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Excavation
Eprocure
Opening Date12 Jun 2024
Closing Date15 Jul 2024
Tender Amount₹ 33,80,000
Costs
EMD
₹ 3,38,000Document Cost
₹ 944Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMRT_927660_1Bid Award Id
ViewTender No
2434/1A, dt 13.05.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supply of kanse/sarpat Poolas in Bundles 1.20M to 1.50M long and 1.0 M circumference (Av.) at a height of 15 cm from the bottom place as per direction of Engineer in charge. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.
2320
-
12
Supply of Nariyal strings of approved quality 12mm dia. including cost of material and carriage etc. complete for tiding ballies. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.
1.5
-
6820
Supply of Wire Rope 8 mm including cost of material and carriage upto site etc. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.
50
-
36
Supply of Wire Rope 10 mm including cost of material and carriage upto site etc. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.
50
-
41
Supply of M.S.Bolt 32 mm dia. and 300 mm long including cost of material and carriage upto site etc. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.
100
-
68
Supply of M.S.Bolt 12 mm dia. and 150 mm & 275 mm long including cost of material and carriage upto site etc. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.
50
-
68
Erection of Pontoon Bridge
Carriying of pontoon pair to the river bank in water including dragging by tractor of making pairs and anchoring properly. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.
27
-
10945
Carriage of pontoon pairs from the place of anchoring to the bridge site erection & adjustment from the adjustment of bridges in water and fixing to the other pantoon pair to form a part of pontoon bridge. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.
27
-
38895
Carriying and pulling wooden anchors in Ganga river water in proper position and anchoring by 32 to 40mm dia. sisal ropes and also including putting of sand bags in anchor. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.
81
-
2460
Carrying and spreading kans/sarpat poolas over bridge way. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.
1000
-
6.5
Carrying and spreading kans/sarpat poolas on approaches in service road before laying the chequered plate as per direction of Engineer in charge. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.
1320
-
2.5
Fixing Railing Post on Pontoons over bridge with nut & bolt complete. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.
130
-
8.5
Providing & supply gunny bags including cost of sand and stitching of bags and laying in position. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.
6800
-
10
Carriage of the following materials from store to bridge site for laying and fixing them on bridge including loading,unloading and stacking as per direction of Engineer-in-charge. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.
(i) Chequered plate size 5.0 M x 1.0 M
35.33
-
178
Carriage of the following materials from store to bridge site for laying and fixing them on bridge including loading,unloading and stacking as per direction of Engineer-in-charge. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.
(ii) Sal Sleepers 4.25 m long
140.25
-
178
Carriage of the following materials from store to bridge site for laying and fixing them on bridge including loading,unloading and stacking as per direction of Engineer-in-charge. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.
(iii) R.S. joist 6.00 M long (ISMB 300 x 140mm)
58.34
-
178
Dismentling of Pontoon Bridge and Carriage of material to safe place
Dismentling of pontoon in water & Carrying pairs from the bridge in water & carrying to the safe site at river banks & anchoring properly as well as to colect the materials as chequered plates. sleepers , R.S. Josts railing post, wire, nut bolts etc. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.
27
-
19445
Carriage of following material from bridge site to store after dismentling the pantoon including loading unloading and stacking properly as per direction of Engineer-in-charge. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.
(i) Chequered plate size 5.0 M x 1.0 M
35.33
-
178
Carriage of following material from bridge site to store after dismentling the pantoon including loading unloading and stacking properly as per direction of Engineer-in-charge. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.
(ii) Sal Sleepers 4.25 m long
140.25
-
178
Carriage of following material from bridge site to store after dismentling the pantoon including loading unloading and stacking properly as per direction of Engineer-in-charge. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.
(iii) R.S. joist 6.00 M long (ISMB 300 x 140mm)
58.34
-
178
Repairs of Old Pontoons
Repairing of old demage pontoon including supply of sheet, bolts nut,labour & tool and plant etc. cutting, bending, welding etc complete as per direction of Engineer-in-charge. Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST.
99
-
2470
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements