Public Works Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date1 Mar 2025
Closing Soon7 Mar 2025
Tender Amount₹ 21,50,430 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 2,30,000Document Cost
₹ 944Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEMRT_1012510_16Tender No
405/3A Dated 27.02.2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, using bitumen VG-10 @ 6.5kg per 10 sqmas per MORD Specification Clause 510.. as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
6000
75
450000
... More
Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M.in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.50 M. lift and 30 M. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 M. distance as directed by the Engineer incharge. excluding Royallity. Wherever applicable for small work or Abadi area. (Where machine can not reach/move) SI. No. 253(a) as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
800
100
80000
... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MORD Specification Clause 302.3 as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
28
110
3080
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MORD specifications Clause 802, 803, 1202 & 1203, P.C.C grade M 10 as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
2
6650
13300
... More
Construction of granular sub-base with Well Graded grading 1 Material (Table 400.1) By Mix in Place Method by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MORD Specification Clause 401 as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
3
3300
9900
... More
Proiding & Laying RCC Hume Pipe NP-3 (S&S type) ISI Mark/prestressed concrete pipe for culverts on first class bedding of granular material including fixing of collar joint with juit & cement mortar 1:2 excluding excavation, protection works, bakfilling, concrete & masonry works in head walls and perapets etc. required for proper completion of the work as per MORD Specifications as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
15
3350
50250
... More
Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and MORD specification Clauses 602, 603, 604, 1202 & 1204 In 1:4 Cement mortar as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
17
5750
97750
... More
Pointing with cement mortar (1:3) on brickwork as per drawing and MORD specification Clauses 613.3 and 1204 as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
40
80
3200
... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per MORD specification Clauses 613.4 & 1204 as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
5
190
950
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%