Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Housekeeping Services
Eprocure
Opening Date4 May 2022
Closing Date13 May 2022
Tender Amount₹ 1,05,68,075 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 7,35,000Document Cost
₹ 2,950Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_CEKNP_695865_1Bid Award Id
ViewTender No
1901C/131C-KV/2022 Dt. 26.04.2022Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Coarse Sand Filling in Plinth including supply of sand, Watering, Ramming etc. Include Cost of all material, labour, T&P etc. required for proper completion of work.SI.NO.255
13
-
1843
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401
41
-
3160
Sand Filling in Plinth including supply of sand, Watering, Ramming etc. Include Cost of all material, labour, T&P etc. required for proper completion of work (Local Sand).SI.NO.255+CH.1.6(b)
72
-
635
Providing and laying in cement concrete 1:4:8 (1 Cement : 4 C/ Sand : 8 40 mm nominal size stone ballast) and curing complete, including cost of form work in foundation and floors. Including supply of all materials, labour, T&P etc complete.SI.NO.281
101
-
5600
Providing and laying in cement concrete 1:2:4(1 Cement : 2 C/ Sand : 4 40 mm nominal size stone ballast) and curing complete, including cost of form work in foundation and floors. Including supply of all materials, labour, T&P etc complete.SI.NO.279
60
-
6500
R.C.C. work with cement approved coarse sand and 20 mm gauge approved stone grit in the proportion of 1:1.5:3 in foundation excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and t & P etc. required for proper completion of the work. Binding wire cost being included in the item SI.NO.289
356
-
8700
Class 150 brick work in 1:6 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour tools and plants, etc, Required for proper completetion of the work.SI.NO.303
12
-
4300
Class 150 brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour tools and plants, etc, Required for proper completetion of the work.SI.NO.305(II)
188
-
4850
Class 150 Half brick work in 1:3 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour tools and plants, etc, Required for proper completetion of the work.SI.NO.307+310(a)
16
-
5240
Painting in D.P.C.with two coats of airblown bitumen 85/50 or 85/25 @ about 1.7 kg /sqm including cost of fuel if any.CH.7SI.NO.3
42
-
160
Providing and injecting chemical imulsion for preconstructional anti termite treatment and creating a chemical barrier under and around the column pits, wall trenches, basement excavation, top surface of plinth, filling junction of wall and floor, along the external perimeter of binding, expansion joints, surrounding of pipes and conduits etc. complete. Plinth area of the ground floor only shall be measured asper I.S.6313(Part II 1981). Aldrine emulsifiable concrete or any other approved material such as heptachlor or chlorpyrifor or chlordane will be used. The Rate of application of chemical emulsion shall be as follows:- (1) Treatment for massonary and foundation 5lt. per sqm. (2) Back flii in immediate contact with foundation 7.5 lt. per sqm (3) Treatment of top surface of plinth filling 5lt per sqm. (4) Treatment of soil along external parameter of building 5.0 l per sqm.CH.8SI.NO.1 NS
538
-
120
Mild steel of iron in plain work such as reinforced concrete/ brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage and hooks and authorised over lapping shall be measured.SI.NO.504(b)
360
-
6180
Supply of Approved M.S. Z-section windows and ventilators excluding cost of glass panes but including supply of all material its fabrication nuts and bolt, hole fast for proper completion of work as per direction of engineer-in-charge and also including cost of handle stays rod etc. and one coat of red oxide paint complete in the respect site of work.SI.NO.502 III(b)
1060
-
62
Mild steel or iron work of small sizes,and section such as holding down bolts, hold fasts, tie, rods, gratings etc., (when not included in an over all rates) wrought to required form, including supply of steel, bolts, nuts and wastage etc and their fixing required for proper completion of the work.SI.NO.502
514
-
61
S/F 32 mm. thick Flush door quality shutter including cost of all material, labour, T&P etc. required for proper completion of work. SI No. 470a
43
-
1530
Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding.SI.NO.502(II)
477
-
62
Renewing glass pans in doors, windows and ventilators etc. 4 mm thick fixed with putti etc. complete including cost of all labour material, T&P etc. SI No. Ch. 812b
28
-
330
Supply & fixing Galvinized mosquto proof heavy quality iron wire gauge of expended metal heavy quality over window including C.P. teak wood batten it cm. x 1 cm. flat iron 25 mm x 4 mm including S/o all material labour T&P etc. complete.CH.19 S.I. No. DSR 9.51
37
-
500
15mm thick plaster with cement mortar in proportion of 1:6 (1cement:6 Coarse sand) mortar including all material, labour T&P etc. complete.CH.13SI.NO.2,17.59(III)
555
-
145
12 mm thick cement plaster 1:4 (1 Cement : 4 Coarse Sand) on smooth surface of wall….all complete work.CH.13SI.NO.2,17.58(II)
510
-
150
Making Grooves 10 to 12 mm wide x 8 mm deep in plaster the all or in ceiling verticaly or Horizontally as required.SI.NO.598
2000
-
31
Providing and applying white cement based putti of average thickness of 1 mm of approved brand and manufacture over the plasterd wall surface to prepare the surface even and smooth including cost of material, labour & T&P etc. complete SI No. Ch. 16 Sl No. 13 NS DSR 13.8
510
-
115
One Priming Coat Two coat of oil distemper on new work including supply of material, labour & T&P etc. required for proper completion of work.SI.NO.649+650.
510
-
80
Finishing walls with two caot ofAcrylic Smooth exterior paint of best quality including supply of all material, labour and T&P etc. required for proper completion of work the work DSR No. 13.46.1 SI No. Ch.15/21
550
-
112
Painting or Vernishing new iron work in small areas or new wood work with one coat (up to one Sq. meter) of ready mixed priming paint and two coat of approved superior quality ready mixed paint or varnish including supply of all materials labour and tools and plants etc. required for proper completion of the work. Paint to be used should confirm the ISI no. 103-1950.SI.NO.641+642.
233
-
88
Providng and laying of 8 to 10mm thick ivory or light shade vitrified tiles of 600mm x 600mm size in flooring or skirting laid with 1 : 3 cement mortar (1 cement , 3 coarse sand) finishing with cement sturry & with pigment grouting & Polishing complete I/C S/O all material labour T & P etc. required for proper completion of work excluding base contrete.CH.14SI.NO.15 NS
440
-
1450
15mm thick cement concrete topping in 1:2 (1 cement :2 stone aggregate of size 4.75 mm and below by volume ) laid over and finished monolithic with structure slab.CH.14 SI.NO.14.66
570
-
195
supply of Glass strips in flooring. 25mm wide - 2.8 to 3.7 mm thick.CH.01 SI.NO.11(b)
90
-
6.5
2.5 cm (1") thick 1:2:4 plain cement concrete floor with cement approved coarse sand and 2cm (3/4") graded approved stone laid in panels finished with 3mm (1/8") floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified over and including 8cm (3") thick base concrete consisting of cement fine sand of 1.25 fineness modulus and brick ballast 4 cm. (1½") gauge in the proportion of 1:4:8 and removing any overlapping mortar at the joints ofthe panels if any and giving them a uniform finish including supply of all materials, labour and tools and plants etc. required for proper completion of the work.(Without base concrete .) CH.14/I.NO.NBO 14.69
107
-
255
Supply and fixing 5 mm thick China white glazed tiles in flooring or in skirting or dado laid with 1:3 cement and approved coarse sand mortar finished with white cement slurry jointing and polishing complete including supply of all materials labour and tools etc, required for completion of the work. (size of tiles upto 200 x 300 mm) SI No. 628
350
-
1260
Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) .CH.14,SI.NO.16 NS.
3.9
-
1000
12 mm thick plaster with cement mortar in proportion of 1:3 (1 cement : 3 coarse sand) mortar including all material,labour T&P etc. complete. CH.13,SI.NO.1/ 17.58(i)
309
-
190
20 mm cement plaster in two coats, backing coat 17 mm and finishing coat 3 mm thick (of neat cement of cement and marble dust in ratio 5:1) on rough side of single or half brick interior plastering upto floor two level including internal rounded angels. ch.no.13/ 17.63(i)
120
-
240
Providing and laying in cement concrete 1:2:4(1 Cement : 2 C/ Sand : 4 20 mm nominal size stone grit) and curing complete, including cost of form work in foundation and floors. Including supply of all materials, labour, T&P etc complete.(SI.NO.279 a )
5
-
6900
Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 6:3:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. As Per SI No. 280
4.4
-
5950
Class-150 brick work in 1:3 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. Required for proper completion of the work. As Per SI No. 307
35
-
5100
RCC work with cement approved coarse sand and 2cm. (3/4'') gauge approved stone ballast in the proportion 1:2:4 in lintels of doors and windows, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.I wire.and including necessary cantering and suttering etc and also including supply of all materials,labour and tools and plants etc. required for proper completion of the work. binding wire to be supplied by the contractor free of cost. but for slabs. but in RCC T-beam and slab roof and RCC columns . (S.I.No. 284)
4.9
-
7800
Supply and Filling over burnt Bricks Ballast 40 mm Guage. As Per Chapter-1 (Material Rate) SI. 2(a)
1
-
900
Supply and Filling Brick Bats of O.B.B. / 150 B.B. As Per Chapter-1 (Material Rate) SI. 2(b)
3
-
1000
40mm thick 1:2:4 plain cement concrete floor with cement approved coarse sand and 2cm (3/4") graded approved stone laid in panels finished with 3mm (1/8") floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified over and including 8cm (3") thick base concrete consisting of cement fine sand of 1.25 fineness modulus and brick ballast 4 cm. (1½") gauge in the proportion of 1:4:8 and removing any overlapping mortar at the joints ofthe panels if any and giving them a uniform finish including supply of all materials, labour and tools and plants etc. required for proper completion of the work. As Per ch.no.14/ SI No.665/14.71
33
-
345
P/L15 cm. dia SW Pipe of 0.60 cm. length @ as per Ch. 22 Sl. No. 58+SI.NO.24.1(b)
135
-
473
P/F White glazed earthern ware W.C. orrisa pan including P trap and including supply of all material, labour, T&P etc. required for proper completion of work. chap No. 22/1,22/7,23/23.11(1b),24/23.113
7
-
2155
S/F low level PVC Cistern with PVC flush pipe 32 mm dia complete with RS Bracket and 15 mm connection including 15 mm dia brass stop cock etc. complete S.I. No. Chap 1/20(60),22/5,22/6,21/97,21/46,24.23.115
7
-
1745
P/F 56 x 41 cm. size wash hand basin of white glazed eathen ware Ist quality Ist marked with C.I. bracket 15 mm C.P. bross, piller cock 32 mm dia, C.P. bross, waste inclusing supply of all material labour T&P etc. complete on Chap No. 21 (97,94b,95,57,46) + 22(11,5) + 24(23.127)
6
-
2241
Supply and fixing of Urinal Ch. 22/10, 22/13,24/23.124
2
-
1615
P/F 60x45x25 cm. Providing fixing 60x45x25 cm. steel sink with drainage board Ist quality ISI marke C.I. bracket and C.P. piller cock ctc. Complete as per Chap 1(79b), 21(95), 22(5),24(23.130)
2
-
4145
P/F 60 x 45 x 55 mm thick bevelled edge mirror of Belgium of Atul Marka glass with indian polish back of 60 cm x 45 cm x 6 mm Bed sheet including S/o all material labour T&P etc. complete. Ch. 22/14+15
6
-
650
Providing and fixing 10 cm Internal dia P.V.C. down pipe com plate for proper completion of work Chap 19/3
350
-
308
Providing and fixing C.P. Soap dish, Jaquar ESSCO, cera,hindware with concealed fitting including supply of all material , labour T&P etc. complete. SI No. Ch. 22/29
17
-
412
Providing and fixing CP Brass towel rail 750x20mm together with pair of CP brass brackets to fit the towel rail complete SI No. Ch. 22/25
11
-
480
Supply and fixing of 15 mm dia CPVC pipe (Chlorinated Polyvnyle Chloride) having thermal stability for hot and cold water supply including all CPVC plan, brass thread fitting and requaire labour etc. complete in all respact SI No. Ch. 19 20mmdia nominal bore DSR 18.8
285
-
205
20mmdia nominal bore
80
-
225
25mm dia nominal bore
230
-
237
32mmdia nominal bore
150
-
250
Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) : SI No. Ch. 21/56 25mm dia nominal bore
14
-
1053
Providing and fixing C.P. brass shower heavy quality (Jaquar ESSCO,cera,Hindware) with Over Head brass Shower Arm 240 mm long with wall flange (Jaquar ESSCO,cera, Hindware) 15mm inlet:100 mm diameter Ch. 21/57,23/23.7(a)
5
-
630
Supply and Fixing C.P. brass bib cock heavy quality short body of 15mm. dia.(L&K,Jaquar Essco) Ch. 21/45,23/23.7(a)
28
-
542
Providing and fixing C.P Stop Cock 15mm dia (L&k,Jaquar ESSCO or equiv.) for geyser points of approved quality 15 mm nominal bore. Ch. 21/50,23/23.7(a)
18
-
517
Providing and fixing CP Jalli heavy quality. Circular type - 100 mm nominal dia Ch. 21/85
14
-
60
Supply and hoisting of low density polythene seamless one peace moulded tank and placing the samein proper position including all taxes labour and T&P etc for proper complation of work. Tank should be ISImarked Chap 19/2
4000
-
6.5
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements