Public Works Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Road Construction
Eprocure
Opening Date4 Mar 2025
Closing Soon10 Mar 2025
Tender Amount₹ 8,95,00,000
Costs
EMD
₹ 17,90,000Document Cost
₹ 6,250Tender Fee
Refer Documents
Summary
Widening And Strengthening Work Of Remaining Part Of Lalitpur City Portion Road In Km
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEJNS_1013655_1Tender No
9111/44 C-jhs-cir/24, Date 12.12.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (ETA) specification including premixing the Material with water at OMC (with 1% OPC & 3.5% SS-1 emulsion) in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MORT&H Specification No. 406 Sl.no.4.14A
3568.13
-
-
... More
Providing and laying dense graded bituminous macadam (Grading-II) with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 Sl. No. 5.04B complete in all respects.
1551.36
-
-
... More
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. As per MORT&H Clause 503 Sl. No. 5.02 (ii)
31334.4
-
-
... More
Providing and laying bituminous concrete (Grading-II) with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 Sl. No. 5.05B complete in all respects
940.03
-
-
... More
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
563.58
-
-
... More
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 310 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
1447.33
-
-
... More
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads up to 3.00 Km., transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
5828.35
-
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. as per MORT&H Specification No. 304, Sl. No. 15.01
1396.59
-
-
... More
Sand Filling in Foundation Trenches as per Drawing & Technical Specification No. 304 S.l No. 15.03
221.29
-
-
... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (as per MoRT&H Specification No. 2100 S.l No. 12.4)
182.52
-
-
... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (PCC grade M 20) (Case-I: Using concrete Mixer (as per MoRT&H Specification No. 1500, 1700 & 2100) Sl. No. 15.11 B
8.4
-
-
... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications No. 1400 & 2200 Sl. No. 15.10
606.03
-
-
... More
Plain/Reinforced Cement Concrete for wall and slab etc. complete as per Drawing and Technical Specifications. (RCC Grade M30) (as per drawing and Technical specification MORT&H no. 1500, 1600 & 1700 Sl. No. 15.12C)
83.29
-
-
... More
Plain/Reinforced Cement Concrete for wall and slab etc. complete as per Drawing and Technical Specifications. (RCC Grade M35) (as per drawing and Technical specification MORT&H no. 1500, 1600 & 1700 Sl. No. 15.12D)
561.62
-
-
... More
Plain/Reinforced Cement Concrete for wall and slab etc. complete as per Drawing and Technical Specifications. (RCC Grade M40) (as per drawing and Technical specification MORT&H no. 1500, 1600 & 1700 Sl. No. 15.12E)
15.42
-
-
... More
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. MORT&H no. 1600 Sl. No. 15.13)
647.96
-
-
... More
Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. as per drawing and Technical specifications MORT&H no. 2507.2 Sl. No. 16.11)
113
-
-
... More
Pointing with cement mortar (1:3) on brick work in substructure as per Technical Specifications MORT&H no. 1300 & 2200 Sl. No. 15.08)
660.2
-
-
... More
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification MORT&H no. 2504 Sl. No. 16.05)
120.06
-
-
... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing face. Complete as per drawing and Technical Specifications Clauses 2706 & 2200 Sl. No. 15.14
280
-
-
... More
Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .
30
-
-
... More
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
205.54
-
-
... More
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401
271.88
-
-
... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (0.25% Construction Cost)
3.55
-
-
... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (0.50% Construction Cost)
3.55
-
-
... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (0.75% Construction Cost)
3.55
-
-
... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (1% Construction Cost)
3.55
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%