Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Eprocure
+2Dehradun, UttarakhandHathras, Uttar Pradesh
Opening Date7 Dec 2019
Closing Date13 Dec 2019
Tender Amount₹ 13,86,00,227 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.(Carted) including labour,, material, T&P etc and all taxes complete Including labour cess but excluding GST. (Lead upto 2 km.)

1400

-

135

... More
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 including labour,material, T&P etc and all taxes complete Including labour cess but excluding GST.

13000

-

120

... More
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Carted) including labour, labour cess, material,T&P etc and all taxes complete Including labour cess but excluding GST.(Lead upto 2km.)

7100

-

140

... More
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. including labour, material, T&P etc and all taxes complete Including labour cess but excluding GST.

7200

-

3200

... More
Providing, laying, spreading of graded stone aggregate (Stablized WMM) after making with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC cement and 3.5% emulsion in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density.including labour, material, T&P etc and all taxes complete Including labour cess but excluding GST.

9300

-

6350

... More
Providing and applying tack coat with bitumen VG-10 using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom. including labour, material, T&P etc and all taxes complete Including labour cess but excluding GST.

68750

-

12.3

... More
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects complete including labour, material, T&P etc and all taxes complete Including labour cess but excluding GST.

2062

-

9100

... More
Cement concrete 2cm gauge approved stone grit, coarse sand and cement in M-30 in pavement as per design thickness for C.C. road coarse and fine aggregate confirming to IS standard mixed in concrete mixer/plant of not less than 0.2cum capacity and approprite weight batcher using approved mix design, laid in approved fixed form work (steel channel) laying and fixing of 125 micron thick polythene film, wedges steel plate including leveling the form work spreading the concrete with shovels, racks compacting using niddle, screed and plate vibrator and finished in continuous operation including making expansion/contraction joints and filling approved filler material in joints also including hassion cloth for curring of concrete pavement for not less than 14 days, puring compound (where as specified) and water finished to line and grade including supply of all material, labour, Tools and plants etc required for proper completion of work and also including complete shifting of material and concrete etc S.I. no. 773(b) including Racron-3s reinforcement fibre @ 1 kg per cum Including cost of all materials, labour, T&P etc. and all taxes complete. Including labour cess but excluding GST..

1300

-

7000

... More
Excavation in foundation in ordinary soil (loam clay and sand) including lift upto 1.50 M and lead upto 30M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the side of foundation including cost of all material, labour,T&P etc and all other taxes Including labour cess but excluding GST.. S.I. No. 251

3400

-

110

... More
Cement Concrete with 4 cm gauge with Stone Ballast coarse sand & Cement in proportion 8:4:1 in foundation proper completion of the work. S.I. No. 281 including cost of all material, labour T&P etc and all other taxes Including labour cess but excluding GST.

560

-

5500

... More
M.S. (Tor steel or plain) in plain work such as R.C.C., R.B. Work including bending and binding for proper shape including supply of steel and its wastage and authorised over lapping shall be measured complete. including cost of all material, labour, T&P etc and all other taxes Including labour cess but excluding GST..S.I. No 502

650

-

6100

... More
M-150 brick work in One cement and Three course sand mortar in foundation and plinth proper completion of work SI.No. 307 including cost of all material, labour, T&P etc and all other taxes Including labour cess but excluding GST..

318

-

4800

... More
Struck pointing with cement mortar consisting one part of cement and 2 part of the fine sand of 1.25 finemes modulus on brick work including supply of all materials labour and completion of work. including cost of all material, labour, T&P etc and all other taxes Including labour cess but excluding GST.. S.I. No. 574

405

-

165

... More
Construction of 1000mm dia R.C.C. Hume Pipe (NP-3) Culvert including cost of all material, labour, labour cess, T&P etc and all other taxes Including labour cess but excluding GST.

85

-

5676

... More
R.C.C. work with 2 cm. gauge approved none grit coarse sand and cement in propertion 4:2:1 in slab etc. excluding supply of reinforcement and its bending including supply of all materials labour, T&P etc. required for proper completion of work SI. 279. Including labour cess but excluding GST.

1350

-

7100

... More
Cement Concrete with 2 cm gauge stone grit / single course sand and cement in proportion of 4:2:1 required for proper completion of the work SI.No. 279 (a) including supply of all materials labour, T&P etc. required for proper completion of work Including labour cess but excluding GST.

15

-

6300

... More
Supply and fixing of NP-3 350mm. dia Hume pipe Including labour cess but excluding GST.

40

-

1258



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.