Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date24 Dec 2024
Closing Date22 Jan 2025
Tender Amount₹ 48,50,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, laying and spreading material on a prepared subgrade, adding cement @ 2% by weight to the spread material manually, mixing in place with Rotavator and compacting with the Road Roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base.

100

3380

338000

... More
Providing, laying and spreading material on a prepared base, cement @ 4%by weight to the spread material manually, mix in place with Rotavator and compacting with the Road Roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base.

468

3780

1769040

... More
Tack Coat (i) Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.Clause 503. MORD

3750

16

60000

... More
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508. Case - II By Mechanical Means(HMP 30/40) (I) Bitumen VG-10

3750

160

600000

... More
Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 Case - III : Type C By Mechanical Means(HMP 30/40) (I) Bitumen VG-10

3750

52

195000

... More
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1..

945

76

71820

... More
Providing and laying reinforced cement concrete pipe NP3 on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1100.(350 mm Dia Hume Pipe Gule)

15

1520

22800

... More
Road Furniture Reflective Sign Board,Reflective Caution Boards,Painting of Km. Stone,Hect.Stone, etc.

1

15000

15000

... More
Maintenance of bituminous surface road and/or gravel road and/or WBM road including filling pot holes and patch repair etc. Restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drain, maintenance of culvert,maintenance of guard rails and parapet,maintenance of road sign,speed breakers, standing tree at adjacent to road wherever required, maintenance of 200m and kilometer stones, cutting of branches of tree, shrubs and trimming of grass and weeds etc. White whashing of parapets including CD Works, painting of guard stones, re-fidding of displaced guard stones (as per performance Index Anexure-1) & maintenance mentioned in GO No. 17 /2024 /S-113/23-1-2024-23-1099/113/2023 Dt. 16.01.2024, Circular no. 3689 C-OPRMC/Original-23-24 Dt. 17.02.2024 Maintenance Charge I year - 0.00% (On Item no. 01 to 15)

1

-

-

... More
Maintenance of bituminous surface road and/or gravel road and/or WBM road including filling pot holes and patch repair etc. Restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drain, maintenance of culvert,maintenance of guard rails and parapet,maintenance of road sign,speed breakers, standing tree at adjacent to road wherever required, maintenance of 200m and kilometer stones, cutting of branches of tree, shrubs and trimming of grass and weeds etc. White whashing of parapets including CD Works, painting of guard stones, re-fidding of displaced guard stones (as per performance Index Anexure-1) & maintenance mentioned in GO No. 17 /2024 /S-113/23-1-2024-23-1099/113/2023 Dt. 16.01.2024, Circular no. 3689 C-OPRMC/Original-23-24 Dt. 17.02.2024 Maintenance Charge II year - 1% (On Item no. 01 to 15.)

1

44388

44388.05

... More
Maintenance of bituminous surface road and/or gravel road and/or WBM road including filling pot holes and patch repair etc. Restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drain, maintenance of culvert,maintenance of guard rails and parapet,maintenance of road sign,speed breakers, standing tree at adjacent to road wherever required, maintenance of 200m and kilometer stones, cutting of branches of tree, shrubs and trimming of grass and weeds etc. White whashing of parapets including CD Works, painting of guard stones, re-fidding of displaced guard stones (as per performance Index Anexure-1) & maintenance mentioned in GO No. 17 /2024 /S-113/23-1-2024-23-1099/113/2023 Dt. 16.01.2024, Circular no. 3689 C-OPRMC/Original-23-24 Dt. 17.02.2024 Maintenance Charge III year - 1.50% (On Item no. 01 to 15.)

1

66582

66582.08

... More
Maintenance of bituminous surface road and/or gravel road and/or WBM road including filling pot holes and patch repair etc. Restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drain, maintenance of culvert,maintenance of guard rails and parapet,maintenance of road sign,speed breakers, standing tree at adjacent to road wherever required, maintenance of 200m and kilometer stones, cutting of branches of tree, shrubs and trimming of grass and weeds etc. White whashing of parapets including CD Works, painting of guard stones, re-fidding of displaced guard stones (as per performance Index Anexure-1) & maintenance mentioned in GO No. 17 /2024 /S-113/23-1-2024-23-1099/113/2023 Dt. 16.01.2024, Circular no. 3689 C-OPRMC/Original-23-24 Dt. 17.02.2024 Maintenance Charge IV year - 2% (On Item no. 01 to 15.)

1

88776

88776.1

... More
Maintenance of bituminous surface road and/or gravel road and/or WBM road including filling pot holes and patch repair etc. Restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drain, maintenance of culvert,maintenance of guard rails and parapet,maintenance of road sign,speed breakers, standing tree at adjacent to road wherever required, maintenance of 200m and kilometer stones, cutting of branches of tree, shrubs and trimming of grass and weeds etc. White whashing of parapets including CD Works, painting of guard stones, re-fidding of displaced guard stones (as per performance Index Anexure-1) & maintenance mentioned in GO No. 17 /2024 /S-113/23-1-2024-23-1099/113/2023 Dt. 16.01.2024, Circular no. 3689 C-OPRMC/Original-23-24 Dt. 17.02.2024 Maintenance Charge V year - 3.00% (On Item no. 01 to 15.)

1

133164

133164.15



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.