Public Works Department Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date22 Mar 2025
Closing Date27 Mar 2025
Tender Amount₹ 8,50,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of embankment with approved material obtained from Right of way pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (3.16) MORT&H Specification 305 Sr No 3.16 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.

45000

-

-

... More
Construction of sub-grade and earthen shoulders with approved material obtained from Right of way with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. MORT&H Specification 305 Sr No 3.18 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.

4100

-

-

... More
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. MORT&H Specification 401 (B) Sr No 4.1 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.

3800

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. MORT&H Specification 406 (A) Sr No 4.14 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.

3300

-

-

... More
Dismantling of flexible pavements and disposal and disposal of dismantled materials up to a lead of 100m, stacking serviceable materials, separately as per Technical specifications 202. Bituminous Courses SI No 17.19 (a) Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.

345

-

-

... More
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. MORT&H Specification 503 (ii) Sr. No. 5.2 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.

31600

-

-

... More
Providing and laying dense graded bituminous macadam Grading 2 with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 505 complete in all respects. Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.

1590

-

-

... More
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. MORT&H Specification 503 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.

31600

-

-

... More
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 B) Sr. No. 5.5 complete in all respects Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.

800

-

-

... More
Construction of sub-grade and earthen shoulders with approved material obtained from Right of way with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. MORT&H Specification 305 Sr No 3.18 (Carted Earth) Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.

2500

-

-

... More
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.

105

-

-

... More
Construction of un-reinforced dowel jointed at expansion and construction joint only,plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30(Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.Technical Specification Clause 1501. Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.

185

-

-

... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. MORT&H Specification 2100 Sr No 12.04 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.

40

-

-

... More
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. MORT&H Specification 1300 Sr No 12.05 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.

89

-

-

... More
Supply and fixing of 350 mm dia NP3 type Hume Pipe S&S in position including labour and T&P etc. required for proper completion of work. Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.

100

-

-

... More
Supply and fixing of 600 mm dia NP3 type Hume Pipe S&S in position including labour and T&P etc. required for proper completion of work. Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.

80

-

-

... More
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications MORT&H Specification 1300 & 2200 Sr No 13.02 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.

130

-

-

... More
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications MORT&H Specification 1300 & 2200 Sr No 13.03 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.

8

-

-

... More
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of First Year @0.00% of Total Work Amount)

1

-

-

... More
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Second Year @0.25% of Total Work Amount)

1

-

-

... More
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Third Year @0.50% of Total Work Amount)

1

-

-

... More
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Fourth Year @0.75% of Total Work Amount)

1

-

-

... More
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Fifth Year @1% of Total Work Amount)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.