Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date8 Nov 2024
Closing Date30 Dec 2024
Tender Amount₹ 1,50,000
Costs
EMD
₹ 15,000Document Cost
₹ 589Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMBD_971052_1Tender No
3015/E-Ten/24-25_Dt_14-10-24Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and applying tack coat with VG-10 using bitumen distributor at the rate of 0.25 kg per sqm on the prepared granular surfaces treated with primer/Bituminous surface as per Technical Specification Clause 503. (Including all T&P, Labour, Material, Royalty Tax but excluding GST)
30
13
405
... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 to required line, grade and level to serve as wearing course on a previously prepared base by manual means, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508 (By Manual Means) (Including all T&P, Labour, Material, Royalty Tax but excluding GST)
30
170
5100
... More
Providing and laying Type "C" seal coat by manual means with VG-10 sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall as per Technical Specification Clause 510 ( By Manual Means) (Including all T&P, Labour, Material, Royalty Tax but excluding GST)
30
65
1950
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. as per MORT&H specification No 12.1& 304 (Including all T&P, Labour, Material, Royalty Tax but excluding GST)
15
160
2400
... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (Including all T&P, Labour, Material, Royalty Tax but excluding GST)
3.5
6200
21700
... More
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. (Including all T&P, Labour, Material, Royalty Tax but excluding GST)
12
5650
67800
... More
Providing and laying reinforced cement concrete pipe NP3 (Including all T&P, Labour, Material, Royalty Tax but excluding GST)
7.5
2500
18750
... More
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications (Including all T&P, Labour, Material, Royalty Tax but excluding GST)
20
85
1700
... More
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications.583 (Including all T&P, Labour, Material, Royalty Tax but excluding GST)
1
180
180
... More
First Year Maintainance (@0% of Total Work Amount of S.No. 1 to S.No.14)
1
-
-
... More
Second Year Maintainance (@1.5% of Total Work Amount of S.No. 1 to S.No.14)
1
2249
2249.78
... More
Third Year Maintainance (@3.0% of Total Work Amount of S.No. 1 to S.No.14)
1
4499
4499.55
... More
Fourth Year Maintainance (@4.5% of Total Work Amount of S.No. 1 to S.No.14)
1
6749
6749.33
... More
Fifth Year Maintainance (@6.0% of Total Work Amount of S.No. 1 to S.No.14)
1
8999
8999.1
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%