Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Road Construction
Eprocure
Opening Date17 Dec 2024
Closing Date6 Jan 2025
Tender Amount₹ 27,35,00,000
Costs
EMD
₹ 41,00,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Summary
Widening And Strengthing Of Maya Tanda Road Sh-30a Ch-14.00 To 33.500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUFZ_984245_1Tender No
8261/Ayo-Amb Circle/2024 Date 06-12-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing, laying, spreading and compacting graded stone aggregate in layers wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
11442.6
-
-
... More
Providing,laying, spreading and compacting graded stone aggregate to wet mix mcacdam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC Cement+3.50% Emulsion in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per clause 406 of Morth specification.
4212
-
-
... More
Providing and laying Dense graded Bituminous Macadam with hot mix plant producing an average output of 75 ton per hour using crused aggregates of specified grading -II premixed with bituminous binder VG-40 @ 4.5% of mix, transported to site , laid over previously prepared surface with paver finisher to the required grade , lavel and alignment and rolled to achieve the desired compaction. as per MORT&H Specification. No 507
2667
-
-
... More
Providing and applying tack coat with bitumen (VG-10) using Bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
121850
-
-
... More
Providing and laying bituminous concrete with hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG 40 @ 5.4% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
3655.5
-
-
... More
Earth work in excavation in foundation of structure as per drawing and technical specification including seeting out, construction of shoring and bracing removal stumps and other deleterous matter, dressing of sides and bottom black filling the excavation earth to the extent require and utlising the remaining earth locally for road work.SI-251
920
-
-
... More
R.C.C work with cement approved course sand and 2 cm {3/4") gauge approved stone ballast in the proportion of 1:2:4 in lintels of doors and windows excluding supply of reinforcement and its bending but including its fixing and bending the same with 24 B.W.G. G.I. binding wire and including neccessary centering and shuttering etc. and also including supply of all materials, labours and T & P etc. required for proper completion of the work. Binding wire cost being included in the item. .SI-283
284.71
-
-
... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastages and over lapping and hookes.SI-504
328.83
-
-
... More
Earth-work Excavation in trenches for foundations pipes, cable etc,(Loan clay or sand) including lift upto 1.5m lead upto 50m. And dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer i/c within ahead of 30m. (For Culvert)
1163
-
-
... More
Providing & laying in cement concerete 1:4:8( 1 cement : 4 Coarse sand : 8 Stone ballast 40 mm.nominal size) and curing complete, including supply of all materials, labour and T&P etc. required for proper completion of work as per direction of E/
2.75
-
-
... More
Providing and laying in Cement concrete 1:3:6 (1Cement:3 Coarse sand :6 graded Stone aggregate 40mm nominal size) and curing complete,including cost fo formwork in foundation and floors.
381.2
-
-
... More
Class-150 brick work in 1:3 Cement and Coarse sand of mortar infoundation and plinth including supply of all materials, labour and tools and plants,etc ,required for proper completion of the work.
411
-
-
... More
Class-150 brick work in 1:3 Cement and Coarse sand of mortar in Super Structure including supply of all materials, labour and tools and plants,etc ,required for proper completion of the work.
604
-
-
... More
R.C.C. work with cement approved coarse sand and 2cm (3/4'') gauge approved srone ballast in the proportion 1:1.5:3 (1Cement: 1.5 Coarse Sand and 3 Stone grit 20 mm size) in lintels of doors and windows excluding supply of reinforcement and its bending but including its fixing and binding the same necessary with 24BWG binding wire and including necessary centering and shuttering etc. and also including supply of materials labour and tools and plants etc. required for proper completion of the work, strength of the concrete shall not be less than M-200
171
-
-
... More
Supplying and laying one layer of tar felt or any other equivalent approved material at the junction of wall and roof of any place an roof as per direction of E/I including necessaryoverlap, giving a coat of approved mastic paint belowthe Tar felt and including supply of all materials , labour and tools and plants etc.Required for propercompletion of work fix as per standard.
125.7
-
-
... More
Supply and fixing of 10cm internal Dia Ac Down pipes required for proper completion of work in weep holes.
128
-
-
... More
Providing and laying in Cement concrete 4:2:1 of not less than strength of M150stone ballast (20 mm nominal size grit) Ratio 2 approved coarse sand ratio 1 Cement.
25.5
-
-
... More
Struck Pointing on brick work with cement mortar 1:2 (1Cement :2 sand)
1471
-
-
... More
Back filling behind abutment, wing wall and retaining wall complete as per drawing and technical specification clause 1204.3.8 of MORD specification.
164.3
-
-
... More
Plaster 12 mm thick in 1:3 cement and coarse sand mortar.
11.8
-
-
... More
P/L of hume pipe mm dia 350mm dia
55
-
-
... More
P/L of hume pipe mm dia 600mm dia
45
-
-
... More
P/L of hume pipe mm dia 900mm dia
20
-
-
... More
Routine maintenance of 5 years (IInd year) @ 0.25% of (1 to 26) item Civil Cost
18.45
-
-
... More
Routine maintenance (IIIrd year) @0.50% of (1 to 26) item Civil Cost
18.45
-
-
... More
Routine maintenance (IVth year) @ 0.75% of (1 to 26) item Civil Cost
18.45
-
-
... More
Routine maintenance (Vth year) @ 1.00% of (1 to 26) item Civil Cost
18.45
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%