Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date31 Dec 2024
Closing Date6 Jan 2025
Tender Amount₹ 15,21,10,000 
Notes
Download

Costs

Summary

Widening And Strengthening Of Sherkot Kandhla Parmawala Harewali Kuankheda Road (odr) Km 14.000 To 26.000

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.

7600

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying with 1% OPC Cement and 3.5% Emulsion (SS Grade) in uniform single layer on sub- base/sub-grade and compacting with Road roller to achieve the desired density. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.

8500

-

-

... More
Providing and applying tack coat with bitumen VG-10 using Bitumen pressure distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.

60000

-

-

... More
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.

2420

-

-

... More
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.

909

-

-

... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.

295

-

-

... More
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.

100

-

-

... More
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.

340

-

-

... More
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.

16

-

-

... More
Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST. (13.1) 1000 mm Dia

67.5

-

-

... More
600 mm Dia New

105

-

-

... More
900 mm Dia Extension

10

-

-

... More
600 mm Dia Extension

30

-

-

... More
Dismantling Brick / Tile work/ rubble masonary/ pitching/ etc by mechanical means. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.

75

-

-

... More
Dewatring. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.

50

-

-

... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (RCC Grade M20). Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.

450

-

-

... More
Furnishing and Placing RCC M25 Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.

380

-

-

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing force. Complete as per drawing and Technical Specifications. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.

100

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.

22

-

-

... More
Wearing coat Box Culvert 4 x 4 m New. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.

9

-

-

... More
Drainage Spout Box Culvert 4 x 4 m New. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.

12

-

-

... More
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.

45

-

-

... More
Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.

135

-

-

... More
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.

75

-

-

... More
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.

150

-

-

... More
Routine Maintenance of road after completion work (A) Carriageway/Pavement: (a) Potholes,cracks,other surface defects (SWMM & BC), (b) Repair of Edges, Rutting (BC). (B) Road, Embankment, Cuttings, Shoulders, Trees & Plantation: (a) Roads Maintained free of edge drop, inadequate cross fall, undulations, settlement, Ponding (E/W), (b) Deficient slopes, rain cuts in embankments (E/W), (c) Vegetation growth, Loping of tree branches. (C) Bridges and Culverts: (a) De-silting, (b) Clearing vegetation growth (Jungle Clearance), (c) Damaged/disturbed boulder pitching, breast /toe wall retaining wall, apron flooring , guide bunds (Boulder Apron), (d) Parapet, any damage to foundations, (e) Any defects in sub-structures, (f) Any defects in superstructures, raillings, parapets., (g) wearing coat, (h) Approach slab, (i) Painting & lettering of No. plates, repairs. (D) Repair of Roadside Drains: (a) Brick Work in 1:4, (b) Plaster, (c) CC-1:2:4. (E) Road Furniture: (a) Cleaning, Painting & lettering of stones & sign boards, Replacement of damaged/ missing stones & sign boards., (b) 200 m stones, (c) Km stones, (d) 5th km stones,. Maintenance requirement as per above and Mentioned in Special Conditions of Contract for Maintenance. Payment of Maintenance work as Percentage of final Civil Construction Cost. For Ist Year @ 0.00 %

-

-

-

... More
For Ist Year @ 0.00 %

12

-

-

... More
For IInd Year @ 0.25 %

12

-

-

... More
For IIIrd Year @ 0.50 %

12

-

-

... More
For IVth Year @ 0.75 %

12

-

-

... More
For Vth Year @ 1.00 %

12

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.