If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Road Construction
Eprocure
Opening Date19 Dec 2024
Closing Soon6 Jan 2025
Tender Amount₹ 12,75,00,000 
Notes
Download

Costs

Summary

Widening And Strengthening Of Mohammadpur-sidhour-kaisarganj Road (odr) In Km-4 To 10(500)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of embankment/shoulder with approved material obtained from borrow pits with all lifts and lead, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.Including cost of all material,Labour,T&P etc. complete as per MORT&H specification and as per direction of Engineer-in-charge.(Local Earth)

22210

-

-

... More
Construction of embankment/shoulder with approved material obtained from borrow pits with all lifts and lead transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.Including cost of all material,Labour,T&P etc. complete as per MORT&H specification and as per direction of Engineer-in-charge.(Carted Earth)

3200

-

-

... More
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401(Relaying of existing materials)

2869

-

-

... More
Construction of granular sub-base by (GSB Gr-1) providing coarse graded of approved quarry material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, including cost of all material, Labour, T&P, etc complete as per MORTH clause 401.

1706

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

1959

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate of approved quarry to wet mix macadam after mixing with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying with 1% OPC cement and 3.5% Emulsion in uniform single layer with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MORTH.

2482

-

-

... More
Providing and applying tack coat with bitumen (VG-10)using bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared above ETA surface cleaned with mechanical broom.Including cost of all material,Labour,T&P etc. complete as per MORTH specification including cost of material, Labour, T&P etc. .Complete as per MORT&H Specification.(For DBM)

30906

-

-

... More
Providing and laying dense graded bituminous macadam with 100-120TPH batch type HMP using crushed aggregates of specified grading, premixed with bituminous (VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.

2298.8

-

-

... More
Providing and applying tack coat with bitumen (VG-10)using bitumen pressure distributor at the rate of 0.20 kg per sqm including cost of all material,Labour,T&P etc. complete as per MORTH specification including cost of material, Labour, T&P etc. .Complete as per MORT&H Specification.(For BC)

45976

-

-

... More
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 30 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification.

1379.3

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material(for drain, culvert etc)

1057

-

-

... More
Providing and laying Cement concrete 1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone ballast 20 mm. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors.(for culverts)

64

-

-

... More
Class- 150 brick work in 1:3 cement and coarsesand of 2.8 fineness modulus mortar in foundation and plinth including supply of all materials labour and ltools and p;ants etc. required for proper completion of the work.(for culverts)

214

-

-

... More
Providing and laying of weephole in brick massonary in abutment and wing wall with 100mm dia PVC pipe extending through the full width of the structuer with slope of 1v:20 H towarddrawing force complete as per drawing and technical specification.(for culverts)

76

-

-

... More
Providing and laying Reinforced cement concrete in M-25 grade concrete including reinforcement and formwork complete as per drawing and Technical specification and as per relevant clauses of section 1500, 1600, 1700 and clause 2704 of specification Sl no. 12.8 D Case I.(for culverts)

17

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications as per MORT&H.(for culverts)

13

-

-

... More
Pointing with cement mortar (1:2) on brick work in substructure as per MORT & H.(for culverts)

236

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification(for culverts)

17.5

-

-

... More
Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by Engineer-in-charge with in a distance of 60 mt. (200 feet) (exisiting parapet)

4.1

-

-

... More
Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 - Brick Masonry in 1:4 cement mortar.(for culverts)

10.6

-

-

... More
Providing and laying 900mm reinforced cement concrete pipe NP4 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets.

7.5

-

-

... More
Providing and laying Cement concrete 1:4:8 ( 1 cement : 4 coarse sand : 8 graded stone ballast 40 mm. nominal size) including supply of all materials. Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork in foundation and floors.(for drain)

112

-

-

... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M 20(for drain)

216

-

-

... More
Mild steel or iron in plan work shch as reinforced concrete or reinforced brick work(when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorized overlapping shall be measured up to floor two level.(for drain)

136

-

-

... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.0% (Item No. 1 to 27)

1

-

-

... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.25% (Item No. 1 to 27)

1

-

-

... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 0.50% (Item No. 1 to 27)

1

-

-

... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 0.75% (Item No. 1 to 27)

1

-

-

... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.00% (Item No. 1 to 27)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.