Public Works Department Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Eprocure
Opening Date22 Feb 2025
Closing Soon7 Mar 2025
Tender Amount₹ 89,30,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement treded Base Provindin, Laying and spreading materila on a prepared surface, subgrade adding cement OPC @ 4 per cent by weight to the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to the achieve the desired unconfined compressive strength and to form a layer of base..Including All Taxes But Excluding GST

630

3500

2205000

... More
Providing and applying tack coat with Bitumen (VG-10) using Bitumen pressure distributor at the rate of 0.35 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.Including All Taxes But Excluding GST

4500

15

67500

... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 11.2 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.Including All Taxes But Excluding GST

4500

152

684000

... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. Including All Taxes But Excluding GST

4500

53

238500

... More
Excavation in foundation in ordinary soil (Loam, Clay or Sand) including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches. Including All Taxes But Excluding GST

300

135

40500

... More
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work. in Foundation and floors. Including All Taxes But Excluding GST

5

5500

27500

... More
Providing and laying of 40 mm gauge Stone balast /Brick Work under Hume pipe culvert foundation & road work including all materials, labour and T&P etc. required for completion of work.Including All Taxes But Excluding GST

70

1300

91000

... More
Class-150 (Non Modular) brick work in 1:3 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. Including All Taxes But Excluding GST

225

5500

1237500

... More
Pointing on brick work on eadge floor with cement mortar 1:2 Ruled Pointing (1cement :2 Fine sand) Including All Taxes But Excluding GST

195

160

31200

... More
12mm Cement plaster with cement mortar in proportion of 1:3 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm in girth and finished even and smooth. Including All Taxes But Excluding GST

12

195

2340

... More
Providing and Laying and fixing of N.P.-3 Hume pipe in proper position as directed by E/I including cartage of pipes/collars upto 30m distance. Including cost of pipes/collars. 350mm Dia, Including All Taxes But Excluding GST.

22.5

1600

36000

... More
Providing Laying and fixing of N.P.-3 Hume pipe in proper position as directed by E/I including cartage of pipes/collars upto 30m distance. Including cost of pipes/collars. 600mm Dia. Including All Taxes But Excluding GST.

15

2600

39000

... More
Providing Laying and fixing of N.P.-3 Hume pipe in proper position as directed by E/I including cartage of pipes/collars upto 30m distance Including cost of pipes/collars. 1000mm Dia. Including All Taxes But Excluding GST.

7.5

5900

44250

... More
Providing and laying cement concrete in 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work. In Foundation and floors.

44.64

6200

276768

... More
RCC work Providing and laying in position specified grade of reinforced cement concrete,Slab including the cost of centering, shuttering, finishing and excluding reinforcement - Above plinth level upto fifth floor level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)

40.38

8500

343230

... More
Mild steel and iron work of small size and section such as holding down woods, hold fasts tierods, grating, etc. (When not included in and over all rates) brought to required form including supply of steel and its wastage including cost of bolts, nuts if required for proper completion of work including fabrication of holes in door chaukhats and nosing.

32

7000

224000

... More
PART-B MAINTENANCE WORK Maintenance Work for Second year

12

5003

60038.04

... More
Maintenance Work for Third year

12

10006

120075.96

... More
Maintenance Work for Fourth year

12

30019

360228.96

... More
Maintenance Work for Fifth year

12

20012

240153

... More
1- Cost of Maintenance of Road for Five Years will be paid as per E.N.C. Letter no.- 3689lh0-PRMC/ewy&23-24 Dt. 17.02.2024.) 2- The departmental road roller if spare, shall be made available to the contractor at site @ Rs. 2500 per day including POL charges, wages of driver and cleaner. If roller is kept idle due to non-availability of material or labour, recovery @ Rs. 2500 per day shall be made from contractor’s bill for idle period.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.