Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date6 Feb 2025
Closing Soon12 Feb 2025
Tender Amount₹ 45,50,000
Costs
EMD
₹ 4,28,000Document Cost
₹ 2,360Tender Fee
Refer Documents
Summary
Bichpuri Railway Fatak To Canal Patri Road
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEAGR_1003106_3Tender No
543/14M-AC/2024-25 dated 28-01-2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches. As per S.I. No. 251.
17
150
2550
... More
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work. in Foundation and floors. As per S.I. No.4.1.8
2
5625
11250
... More
Class-150 (Non Modulao brick work in 1 :4
cement and Coarse sand mortar in fundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work
1.1
5650
6215
... More
12mm cement plaster with cement mortar in proportion of 'l:4 cement & coarse sand of single coat for interior plastering upto flool two level including internal rounded angles chamfers, and rounded angles not exceedlng 80mm. ln girth and finished even and smooth.
3.4
200
680
... More
Reinforced cement concrete work in walls (any thickness), including attachedpi lasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abulments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement:1:1.5:3 (1 cement: 1.5 coarse sand ;3 graded stone aggregate 20 mm nominal size) upto plinth level
0.4
8350
3340
... More
Supply and Fixing of HYSD bar in proper alignment, filling and slopes etc. Complete as dwawing and technical specification..
65
80
5200
... More
Supply and laying & fixing of NP-3 Hume Pipe in proper alignment, joint filling and slopes etc. Complete as dwawing and technical specification..
5
6674
33370
... More
Providing and laying cement concrete in 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work. in Foundation and floors. As per S.I. No. 4.1.3
8
6600
52800
... More
Note - 1. GST will be paid as per rule.
2. Labour Cess 1% included in above rates and same will be deducted at the time of payment.
3. Bitumen/ Emulsion will be issued to the contractor as per Schedule "C"
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%