Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date10 Jan 2025
Closing Date20 Jan 2025
Tender Amount₹ 11,27,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, laying spreading & compacting of granular sub-base by providing coarse graded (Gr-1) materials, spreading in uniform layers with Motor Grader on prepared surface, mixing by mix in placed method with Rotovator at OMC and compacting with in layers with smooth wheeled Vibratory Roller to achieve the desired density, complete and including all machinery charges & including all labour, T&P etc required for proper completion of the work. as directed by Engineer Incharge. As per MoRT&H clause 401(b).

5250

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MoRT&H Specification 406.

2500

-

-

... More
Providing & applying Tack Coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.25Kg./Sqm. on the prepared primed granular/old painted surface, cleaned with Mechanical broom, including all Taxes, Material, Labour, T&P etc required for proper completion of the work.

30950

-

-

... More
Providing and laying Dense Graded Bituminous Macadam 100-120 TPH HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.50% by weight of total mix and filler, transporting the hot mix to work site laying with hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth Wheeled vibratory & Tandom Rollars to acheive the desired compaction as per MORT&H Specifications clause 505 Complete in all respects. (5.04)

1695

-

-

... More
Providing & applying Tack Coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20Kg./Sqm. on the prepared primed granular/old painted surface, cleaned with Mechanical broom, including all Taxes, Material, Labour, T&P etc required for proper completion of the work. (For BC)

37000

-

-

... More
Providing and laying Bituminous Concrete with 100-120 TPH HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grade premixed with bituminous binder VG-30 @ 5.40% of mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with to the required grade, level and alignment, rolling with smooth Wheeled vibratory & Tandom Rollars to acheive the desired compaction as per MORT&H Specifications clause 509 Complete in all respects.

1100

-

-

... More
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work. in Foundation and floors. As per S.I. No. 4.1.8

700

-

-

... More
RCC work Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) Ch-5 SI No- 5.1.2

540

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete including Labour for straightening, cutting, bending, shifting to site, tying and placing in position as per drawing and technical specifications ( for Drain)

31

-

-

... More
Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. As per S.I. No. 6.1.1

40

-

-

... More
Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 coarse sand) :Raised and cut pointing. As per S.I. No 13.31.2

18

-

-

... More
12mm Cement plaster with cement mortar in proportion of 1:4 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm. In girth and finished even and smooth. As per S.I. No. 13.4.1

10

-

-

... More
Providing and laying cement concrete in 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, Including cost of form work. In Foundation and floors. As per S.I. No. 4.1.3

5

-

-

... More
Supply and laying & fixing of 350mm dia NP-3 Hume Pipe in proper alignment, joint filling and slopes etc. Complete as dwawing and technical specification.

40

-

-

... More
Supply and laying & fixing of 600mm dia NP-3 Hume Pipe in proper alignment, joint filling and slopes etc. Complete as dwawing and technical specification.

20

-

-

... More
Supply and laying & fixing of 1000mm dia NP-3 Hume Pipe in proper alignment, joint filling and slopes etc. Complete as dwawing and technical specification.

70

-

-

... More
Coursed rubble masonry (first sort) with hard stone in foundation plinth cement mortar . 1:6 (1 cement : 6 coarse sand). As per S.I. No 7.6

3600

-

-

... More
Plain/Reinforced Cement Concrete (PCC Grade M15 ) in Open Foundation complete as per Drawing and Technical Specifications. As per MORT&H Specification no. 12.8ACase-II

104

-

-

... More
Sand Filling in Foundation Trenches as per Drawing & Technical Specification. As per MORT&H Specification no. 304 (12.03).

210

-

-

... More
Reinforced Cement Concrete (M-30) in Open Foundation complete as per Drawing and Technical Specifications. As per MORT&H Specification no. 12.8GCase - II

285

-

-

... More
Plain/Reinforced cement concrete (RCC M-30) in sub-structure complete as per drawing and Technical Specifications. As per MORT&H Specification no. 13.05

150

-

-

... More
Furnishing and Placing Reinforced/ Prestressed cement concrete (RCC M-30) in super-structure as per drawing and Technical Specification. As per MORT&H Specification no. 14.1C Case II

250

-

-

... More
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. As per MORT&H Specification no. 12.42 (For minor Bridge)

61

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications, all complete as per clause 2702. As per MORT&H Specification no. 14.4

22

-

-

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. As per MORT&H Specification no. 13.8

96

-

-

... More
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. As per MORT&H Specification no. 15.1

54

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.

38

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification. As per MORT&H Specification no. 13.9

130

-

-

... More
Drainage Spouts complete as per drawing and Technical specification. As per MORT&H Specification no. 14.9

12

-

-

... More
Dewaterng of water trenches during excavation, concreting, masonary works upto sub soil/ water level including hire charges of 5 H.P.

960

-

-

... More
Boring with 100 dia casing pipe including lowering & extraction, assembling, loading, unloading & cartage etc (hire charges only).

4

-

-

... More
Dismantling R.C.C. work manually by mechenical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as directed by Engineer-In-Charge. As per S.I. no. 15.30

230

-

-

... More
Empty Cement Bags of good condition (Plastic) filled with Carted Earth including filling, stiching and stacking at side of filling.

5400

-

-

... More
Maintainance Charge including @ Earth Work, repair of painted surface, Earth Work on patri, Culvert, Road Furniture etc as per Direction of E/I for the period of Five Year from the actual completion of work. including royalty on materials. GST shall be paid extra as applicable at the time of payment.

-

-

-

... More
Maintainance of First Year (@ 0.00% of Total Work Amount of 1 to 36)

1

-

-

... More
Maintainance of Second Year (@0.25% of Total Work Amount of 1 to 36)

1

-

-

... More
Maintainance of Third Year (@0.50% of Total Work Amount of 1 to 36)

1

-

-

... More
Maintainance of Fourth Year (@0.75% of Total Work Amount of 1 to 36)

1

-

-

... More
Maintainance of Fifth Year (@1% of Total Work Amount of 1 to 36)

1

-

-

... More
Note - 1- Rates are inclusive of all taxes but excluding GST which shall be paid extra as applicable 2- Labour cess @ 1% will be deducted from contractor's bill at the time of payment 3-Maintenance will be calculated on value of actual work ( S.No-1 to 36)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.