Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date31 Dec 2024
Closing DateCancelled
Tender Amount₹ 27,44,715 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 2,67,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMRT_988227_33Tender No
3850/4A-Camp date 28.12.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type-C as per Technical Specification Clause 508. Including all material, labour, T&P, Taxes, Cess etc. complete as per direction of Engineer-in-charge but excluding GST.
2400
180
432000
... More
Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 Including all material, labour, T&P, Taxes, Cess etc. complete as per direction of Engineer-in-charge but excluding GST.
2400
68
163200
... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Including all material, labour, T&P, Taxes, Cess etc. complete as per direction of Engineer-in-charge but excluding GST.
360
125
45000
... More
Brick edging on both side of the road of M-150 bricks 7 cm. wide. 11 cm. deep, laid with mud mortar including labour & supply of bricks finished to the required template and in proper alignment and also including dressing and ramming the excavated earth as directed by the Engineer-in-charge as per SI 765 Including all material, labour, T&P, Taxes, Cess etc. complete as per direction of Engineer-in-charge but excluding GST.
0.8
90000
72000
... More
(Bitiminous Work) 05 years Maintenance Charge @7.5%
Routine maintenance of road for 05 years after the completion of work vide GO No. - 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & Latter No. 36890C/RMC/Mool-23-24, Date 17.02.2024 of ENC PWD, Lucknow Rate Excluding Cost of G.S.T.
First year Maintenance Charge @ 0.00%
2620200
-
-
... More
Second year Maintenance Charge @ 0.75 %
2620200
-
19651.5
... More
Third year Maintenance Charge @ 1.50%
2620200
-
39303
... More
Fourth year Maintenance Charge @ 2.25%
2620200
-
58954.5
... More
Fifth year Maintenance Charge @ 3.00%
2620200
-
78606
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements