Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date3 Dec 2024
Closing Date9 Dec 2024
Tender Amount₹ 3,71,000
Costs
EMD
₹ 37,000Document Cost
₹ 860Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMRZ_979573_3Bid Award Id
ViewTender No
3101/6A Date 09-11-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing Laying and rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm & 11.2 mm aggregate either using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base. Including mixing in a suitable plant or mixol laying and rolling with a three wheels 80-100 KN static roller capacity, finished to required level and grade.
600
169
101400
... More
Providing and laying of seal coat type "C" sealing the voids in a bitumens surface laid to the specified levels,using crushed stone chipping 6.7 mm size and penetration bitumen grade V.G.-10 as per techinical Specification Clause 510.(Including cost of bitumen)
600
62
37200
... More
Earthwork in excavationin ordinary soil for structures as Per drawing and techanical specification clause 305 including setting out, construction of shoring and bracing, removal of stumps and other deleterous material and disposal up to a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material.
24.36
128
3118.08
... More
S/O 600 mm dia NP3 Hume pipe culvert 7.5 M long including S/O all material, labour T&P and etc. required for proper completion of work ( as per details of drawing) as per direction of E/I
7.5
1750
13125
... More
P/L , fixing, jointing 600 mm 7,5 R/M As Per SOR Sr No.30 NS5(A) (iii)
2
400
800
... More
Plain Cement Concrete (PCC) M-10(1:3:6 Nominal Mix) in open foundation complete as per drawing and techanical specification Clause 802.
3.02
5450
16459
... More
Stone masonary work in cement mortor(1:4) in foudation complete asper drawing and techanical specification clauses 702,704,1202 and 1203(2nd sort).
14.58
4350
63423
... More
Raised pointing with cement morter consisting of 1 part cement and 3 parts of sand of 1.25 F/M inclduing supply of all meterials; labour and T&P etc. required for proper completion of the work as per SOR No.574
17.94
70
1255.8
... More
12 mm thick plaster with cement morter in porportion of 1:4 cement and sand of 1.25 F.M. over brick work minimum thickness not be less than 10 mm including supply of all materials, labour and T&P etc. required for proper completion of the work as per SOR No. 584
3.84
180
691.2
... More
Earthwork embankment in patari with ordinary soil including 1.50M lift and 30M lead and i/c all labour, royalty T&P etc in required slop for proper completion of work as per direction of E/I.
65
80
5200
... More
The routine maintenance of above road work including embankment, patri, pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surpace and structure in Defeft free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) For 1st Year Maintenance cost (0%)
0.2
-
-
... More
The routine maintenance of above road work including embankment, patri, pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surpace and structure in Defeft free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) For 2nd Year Maintenance cost (1.5%)
0.2
24000
4800
... More
The routine maintenance of above road work including embankment, patri, pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surpace and structure in Defeft free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) For 3rd Year Maintenance cost (3.00%)
0.2
48000
9600
... More
The routine maintenance of above road work including embankment, patri, pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surpace and structure in Defeft free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) For 4th Year Maintenance cost (4.50%)
0.2
72000
14400
... More
The routine maintenance of above road work including embankment, patri, pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surpace and structure in Defeft free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) For 5th Year Maintenance cost (6.00%)
0.2
96000
19200
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements