Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Eprocure
Opening Date5 Nov 2024
Closing Date19 Nov 2024
Tender Amount₹ 10,63,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and applying tack coat with bitumen VG-10 using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.GST will be paid extra as per prevelling rules.

562.5

12

7031.25

... More
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 80-100 KN capacity, finished to required level and grades to followed by seal coat.GST will be paid extra as per prevelling rules.

562.5

178

100125

... More
Providing and laying seal coat Type C sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall .GST will be paid extra as per prevelling rules.

562.5

62

34875

... More
CC Work

-

-

-

... More
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing

84.38

7900

666602

... More
Maintenance Charges 5 Years from the Actual completion of Work for PC

-

-

-

... More
Maintenance cost of Ist year

1

-

-

... More
Maintenance cost of 2nd year @ 1.50 % cost of Work

1

3507

3507.47

... More
Maintenance cost of 3rd year @ 3.00 % cost of Work

1

7014

7014.94

... More
Maintenance cost of 4th year @ 4.50 % cost of Work

1

10522

10522.41

... More
Maintenance cost of 5th year @ 6.00 % cost of Work

1

14029

14029.88

... More
Maintenance Charges 5 Years from the Actual completion of Work for CC

-

-

-

... More
Maintenance cost of Ist year

1

-

-

... More
Maintenance cost of 2nd year @ 0.25 % cost of Work

1

1666

1666.51

... More
Maintenance cost of 3rd year @ 0.50 % cost of Work

1

3333

3333.01

... More
Maintenance cost of 4th year @ 0.75 % cost of Work

1

4999

4999.52

... More
Maintenance cost of 5th year @ 1.00 % cost of Work

1

6666

6666.02



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.