If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Road Construction
Eprocure
Opening Date10 Dec 2024
Closing Soon1 Mar 2025
Tender Amount₹ 22,03,75,000
Costs
EMD
₹ 33,06,000Document Cost
₹ 6,250Tender Fee
Refer Documents
Summary
Widening And Strengthening Of Kabrai Pahara Link Road (odr) Under Inter State Connectivity In Fy 2024-25
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEJNS_982011_1Tender No
1753/30C-Hamirpur Circle/2024 Date 18.09.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of subgrade & Earthen shoulder with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300-2.
20800
-
-
... More
GSB
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401
5480
-
-
... More
WMM
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
6230
-
-
... More
ETA
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam after mixing with water at OMC in mechanical mix plant carriage of mixed matarial by tipper to site laying with 1% OPC cement and 3.5 % emulsion in uniform single layer on sub base /subgrade and compacting with road roller to acheive desire density.
830
-
-
... More
Primer Providing and applying Primer coat with bitumen Emulsion using bitumen pressure distributor at the rate of 0.70 kg per sqm on the prepared surface cleaned with mechanical broom.
26250
-
-
... More
Tack
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
65100
-
-
... More
Tack
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
65730
-
-
... More
DGBM-I
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
2230
-
-
... More
DGBM (Grade-II)
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
2030
-
-
... More
BC
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
1980
-
-
... More
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Patri)
24500
-
-
... More
Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the Engineer-in-charge within a distance of 60 meters(200 feet) (SOR SI No.692)
200
-
-
... More
Excavation in foundation in balck cotton soil including lift upto 1.5 m. and lead upto 30 m. and including filling. Watering and raming of Excavated earth into the trenches or into the space between the building and the side of foundation, trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 m. form the foundation trenches.(S.I. No-251)
2450
-
-
... More
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8km (5 miles) from the side of work & including watering ,dressing etc. Rate to include cost of all materials,labour and tools & plants,etc. required for proper completion of the work. (S.I. No-255)
450
-
-
... More
Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 4:2:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. (S.I. No-279)
210
-
-
... More
RCC work with cement approved coarse sand and 2cm. (3/4'') gauge approved stone ballast in the proportion 1:1.5:3 in lintels of doors and windows, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.I wire.and including necessary cantering and suttering etc and also including supply of all materials,labour and tools and plants etc. required for proper completion of the work. binding wire to be supplied by the contractor free of cost. (S.I. No-289)
3390
-
-
... More
Mild steel or iron work of small sizes and sections such as holding down bolts, hold fasts, tierods, gratings, etc. (when not included in over all rates) wrought to required from excluding supply of steel bolts, nuts wastage etc and including their fixing required for proper completion of the work. (S.I. No-502)
4150
-
-
... More
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301
740
-
-
... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications Clause 2706 & 2200 of MORTH. (S.I. NO- ch-1 36 (31)
390
-
-
... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall return wall to the full hight, compacted to firm condition complete as per drawing and technical specification clause 1204.3.8 S.I.No Ch-12 (12.11)
450
-
-
... More
Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all materials, labour, tools and plants etc. required for proper completion of work.(S.I. No-660)
670
-
-
... More
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Carted Earth)
5500
-
-
... More
Supply of 1000 mm dia NP-3, S&S Hume Pipe including cartage upto site laoding, unloading and all Taxes etc. SOR SI No 11Non Sch. Chapter 20 Road Work
112.5
-
-
... More
Running of 5HP pump for dewatering including arrangement of pump suction and delivery pipes and other accessories ar site including cost of POL
1900
-
-
... More
Cement concrete with 2cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 4:2:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. -279
1.2
-
-
... More
Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 8:4:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. -279
230
-
-
... More
RCC work with cement approved coarse sand and 2cm. (3/4'') gauge approved stone ballast in the proportion 1:2:4 in lintels of doors and windows, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.I wire.and including necessary cantering and suttering etc and also including supply of all materials,labour and tools and plants etc. required for proper completion of the work. binding wire to be supplied by the contractor free of cost.-283
95
-
-
... More
Random course Rubble massonary in 1:4 cement and fine sand mortar in foundation and plinth, including supply of all materials, labour & T&P etc. required for proper completion of the work. Ch-8
170
-
-
... More
Raised pointing with cement and fine sand of 1.25 fineness modulus mortar on brick work in proportion of 1:2 including supply of all materials, labour and tools and plants etc. required for proper completion of the work-577
210
-
-
... More
12mm thick plaster on brick work minimum thickness not less than 10mm with 1part of cement and 4 part of find sand of 1.25 fineness modulus.S.I.No-584
3.8
-
-
... More
Bedding for Pipe Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) (S.I. No- ch-9 9.2)
6.5
-
-
... More
Cement concrete with 4cm gauge approved stone ballast, approved coarse sand. cement in the proportion 6:3:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. (As per Chap-5 S.I. No. 280)
21.5
-
-
... More
Maintainance Charge including @ Earth Work,
repair of painted surface, Earth Work on patri,
Culvert, Road Furniture etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of Work Amount 1 to 35 (Excluding G.S.T.)
Maintainance of First Year (@ 0.00% of Total Work Amount of 1 to 35)
1
-
-
... More
Maintainance Charge including @ Earth Work,
repair of painted surface, Earth Work on patri,
Culvert, Road Furniture etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of Work Amount 1 to 35 (Excluding G.S.T.)
Maintainance of First Year (@ 0.25% of Total Work Amount of 1 to 35)
1
-
-
... More
Maintainance Charge including @ Earth Work,
repair of painted surface, Earth Work on patri,
Culvert, Road Furniture etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of Work Amount 1 to 35 (Excluding G.S.T.)
Maintainance of First Year (@ 0.50% of Total Work Amount of 1 to 35)
1
-
-
... More
Maintainance Charge including @ Earth Work,
repair of painted surface, Earth Work on patri,
Culvert, Road Furniture etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of Work Amount 1 to 35
(Excluding G.S.T.)
Maintainance of First Year (@ 0.75% of Total Work Amount of 1 to 35)
1
-
-
... More
Maintainance Charge including @ Earth Work,
repair of painted surface, Earth Work on patri,
Culvert, Road Furniture etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of Work Amount 1 to 35 (Excluding G.S.T.)
Maintainance of First Year (@ 1.00% of Total Work Amount of 1 to 35)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%