Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date27 Dec 2024
Closing Soon18 Jan 2025
Tender Amount₹ 7,35,00,000
Costs
EMD
₹ 14,70,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMBD_986757_1Tender No
6369/E-Tender-RC/24-25 Date 11.12.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of embankment with approved material obtained from borrow pits with all lifts and 2 Km. leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
10200
-
-
... More
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
9300
-
-
... More
FDR - Stablized Base/Sub-base @ 4.50 % cement :-Providing, laying, spreading and compacting of existing granular material adding Cement @ 4.5 percent by weight of granular material and admixture @ 2% by weight of Cement using truck mounted / self propelled cement spreader shall have variable working width with microprocessor, controlled spray rate through augers and cellular wheels. The aggregate shall be in situ pulverized/stabilize using four wheeled drive recycler having working depth up to 50 cm with variable depth control system. Compacting with vibratory roller to achieve design unconfined compressive strength.
10600
-
-
... More
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401
140
-
-
... More
Crack Prevention Courses
Stress absorbing membrane (SAM) crack width above 9 mm and cracked area above 50 percent
Providing and laying of single coat of a stress absorbing membrane over a cracked road surface, with crack width above 9 mm and cracked area above 50 percent after cleaning with a mechnical broom, using modified binder complying with IRC:SP 53, sprayed at the rate of 15 kg per 10 sqm and spreading 11.2 mm crushed stone aggregate @ 0.12 cum per 10 sqm, sweeping the surface for uniform spread of aggregates and surface finished to conform to clause 902.
42500
-
-
... More
Providing and applying Primer Coat with SS2 Grade Bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer @ 0.70 kg/sqm using mechanical means.
42500
-
-
... More
Providing and applying Tack Coat with Bitumen VG-10 using pressure distributor @ 0.25 kg per sqm on the prepared Granular surface cleaned with mechanical broom.
42500
-
-
... More
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.40% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisherwith sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507complete in all respects.
1700
-
-
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 (By Manual Means)
340
-
-
... More
Construction of un-reinforced, dowel jointed, Plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
462
-
-
... More
Excavation for Structures; Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil (Depth upto 3Mt)
870
-
-
... More
PCC 1:3:6 in foundation; Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
114
-
-
... More
Reinforced cement concrete-M25 in super-structure as per drawing and Technical Specification
162.8
-
-
... More
Reinforced cement concrete-M20 in super-structure as per drawing and Technical Specification
160
-
-
... More
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications.
125
-
-
... More
Pointing with cement mortar (1:3) on brick work in substructure as per Technical Specifications
325
-
-
... More
Plastering with cement mortar (1:3) on brick work in sub-structure as per Technical Specifications
24
-
-
... More
Providing and laying reinforced cement concrete pipe NP3 1000mm dia for culverts. (Morth SI. No. 9.20)
20
-
-
... More
Providing and laying reinforced cement concrete pipe NP3 600mm dia for culverts. (Morth SI. No. 9.20)
20
-
-
... More
HYSD in Foundation Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
23200
-
-
... More
Maintainance Charge including @ Earth Work, repair of painted surface, Earth Work on patri, Culvert etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of Work Amount 1 to 22 (Excluding G.S.T.) (I) Maintainance of First Year (@0% of Total Work Amount of S.No. 1 to S.No.22)
1
-
-
... More
Maintainance Charge including @ Earth Work, repair
of painted surface, Earth Work on patri, Culvert etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of Work Amount 1 to 22 (Excluding G.S.T.) (I) Maintainance of Second Year (@0.25% of Total Work Amount of S.No. 1 to S.No.22)
1
-
-
... More
Maintainance Charge including @ Earth Work, repair
of painted surface, Earth Work on patri, Culvert etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of Work Amount 1 to 22 (Excluding G.S.T.) (I) Maintainance of Third Year (@0.50% of Total Work Amount of S.No. 1 to S.No.22)
1
-
-
... More
Maintainance Charge including @ Earth Work, repair of painted surface, Earth Work on patri, Culvert etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of Work Amount 1 to 22 (Excluding G.S.T.) (I) Maintainance of Fourth Year (@0.75% of Total Work Amount of S.No. 1 to S.No.22)
1
-
-
... More
Maintainance Charge including @ Earth Work, repair of painted surface, Earth Work on patri, Culvert etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of Work Amount 1 to 22 (Excluding G.S.T.) (I) Maintainance of Fifth Year (@1% of Total Work Amount of S.No. 1 to S.No.22)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%