Public Works Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date16 Nov 2024
Closing DateCancelled
Tender Amount₹ 28,30,000
Costs
EMD
₹ 2,83,000Document Cost
₹ 1,227Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEKNP_974462_13Tender No
3059/12A/Tender/2024 Dated 14-10-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and applying tack coat with bitumen (VG-10) using bitumen pressure distributor at the rate of 0.30 kg per sqm on the granular surface cleaned with mechanical broom as per technical specification clause 503 including cost of bitumen.
4200
15
63000
... More
Providing, laying and rolling of open-graded Premix Carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen (VG-10) to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in Hot mix plant, laying and finishing with paver finisher and compaction with three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by Seal Coat 'Type-C' as per MORD Technical Specification Clause 508 including cost of bitumen. Case-II By Mechanical Means (HMP 30/40) (I) Bitumen VG-10
4200
165
693000
... More
Providing and laying Seal Coat sealing the voids in a bituminous (VG-10) surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 including cost of bitumen. Case - III : Type C By Mechanical Means(HMP 30/40) (I) Bitumen VG-10.
4200
56
235200
... More
Construction of subgrade and Earthern shoulders with approved material obtained from borrow pits with a lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Tables 300-2 with a lead upto 1000 m as per Technical specification clause 303.1.
600
78
46800
... More
Maintenance of bituminous surface road including filling potholes
and patch repair etc. restoration of rain cuts and dressing of side slopes / shoulders, drain, culvert, guard rail and parapet, road sign, speed breakers, standing tree adjacent to road wherever required, kilometer and hectometer stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc.white whashing of parapet including CD Work, painting of guard stones and Re-fidding of displaced guard stones etc. as per direction of E/I for the period of five years from the actual completion of work. (Excluding GST) (as per performance index annexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.10.2024
& Enc letter no 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (Maintenance cost for 1st year @ 0.00% cost of work of Total work of amount 1 to 7)
1
-
-
... More
Maintenance cost for 2nd year @ 0.75% cost of work of Total work of amount 1 to 7
1
17686
17686.13
... More
Maintenance cost for 3rd year @ 1.50% cost of work of Total work of amount 1 to 7
1
35372
35372.25
... More
Maintenance cost for 4th year @ 2.25% cost of work of Total work of amount 1 to 7
1
53058
53058.38
... More
Maintenance cost for 5th year @ 3.00% cost of work of Total work of amount 1 to 7
1
70744
70744.5
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements