Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date13 Nov 2024
Closing Soon24 Dec 2024
Tender Amount₹ 7,80,00,000
Costs
EMD
₹ 15,60,000Document Cost
₹ 5,590Tender Fee
Refer Documents
Summary
Widening And Strengthening Work Of Machhlishahar Baraipar Road (odr) Km 1 To 7.90 In District Jaunpur
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUVZ_973501_1Tender No
72/Camp/SE Tender/jnp-gzp circle/24 date 10-10-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Stablised Sub-base (FDR Technology) Providing, laying, spreading and compacting of existing granular material adding cement using truck mounted / self propelled cement spreader shall have variable working width with microprocessor, controlled spray rate through augers and cellular wheels. The aggregate shall be in situ pulverized/stabilize using four wheeled drive recycler having working depth up to 50 cm with variable depth control system. Compacting with vibratory roller, Pneumatic roller and vibratory Pad Fool pad roller (20 tonne) to achieve design unconfined compressive strength (Including all material, T&P, labour cess etc. but excluding G.S.T.)
8690
-
-
... More
ETA- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with Soil campactor roller to achieve the desired density. (WMM+1%OPC Cement+3.5% Emulsion) (Including all material, T&P, labour cess etc. but excluding G.S.T.)
4345
-
-
... More
Providing and applying Tack Coat with Bitumen VG-10 using bitumen sprayer at the rate of 0.25 kg per sqm on the prepared surface cleaned by mechanical broom. (Including all material, T&P, labour cess etc. but excluding G.S.T.)
43450
-
-
... More
Providing and laying 40mm thick bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specified grading premixed with bituminous binder @ 5.40 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specifications Clause 509 complete in all respects. (Including all material, T&P, labour cess etc. but excluding G.S.T.)
1738
-
-
... More
Construction of sub grade and earthen shoulder with approved material obtained from borrow pits with all lift, lead (1 Km.) & transporting to site spreading to required slope and compacting to meet requirement of table 300.2(Including all material, T&P, labour cess etc. but excluding G.S.T.)
3627
-
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material for Boggi action For U-Drain (Including all material, T&P, labour cess etc. but excluding G.S.T.)
256
-
-
... More
Plain cement concrete M15 in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundationand compacted by vibration including curing for 14 days foundation. For U-Drain (Including all material, T&P, labour cess etc. but excluding G.S.T.)
64
-
-
... More
RCC Grade M20 Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. For U-Drain (Including all material, T&P, labour cess etc. but excluding G.S.T.)
116.8
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in super structure complete as per drawing and technical specifications For U-Drain (Including all material, T&P, labour cess etc. but excluding G.S.T.)
7.34
-
-
... More
PART A
Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024
0.05
-
-
... More
1st year- maintainance cost 0% on Bituminous Work, Drain etc. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
7.9
-
-
... More
2nd year- maintainance cost 0.25% on Bituminous Work, Drain etc. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
7.9
-
-
... More
3rd year- maintainance cost 0.50 % on Bituminous Work, Drain etc. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
7.9
-
-
... More
4th year- maintainance cost 0.75% on Bituminous Work, Drain etc. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
7.9
-
-
... More
5th year- maintainance cost 1.00 % on Bituminous Work, Drain etc. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
7.9
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%