Public Works Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Eprocure
Opening Date16 Mar 2021
Closing Date23 Mar 2021
Tender Amount₹ 23,38,900 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 2,35,000Document Cost
₹ 900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_CEDPW_570685_1Bid Award Id
ViewTender No
687/2A dt 10-03-2021Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and applying tack coat with V.G.-10 Bitumen using distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
5700
-
11.3
... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508.
5700
-
179
... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510
5700
-
58.8
... More
Construction of Patri with approved material obtained from borrow pits with a lift upto 1.5m with normal lead upto 50m, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.1 and 300.2 as per technical specification clause 301.5.
1391.2
-
85
... More
E/W in excavation in foundation in ordinary soil including lift 1.50 mtr and lead up to 30 mtr and including filling watering ramming of excavated earth into the trenches or into the space of between the building and side the foundation trench or into the plinth and removal and disposal of surplus earth as per direction by E/I as per S.I. No. 251
31.28
-
110
... More
Providing and laying Cement concrete 1:4:8( 1 cement : 4 fine sand : 8 graded brick aggregate 40 mm. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. As per SI No. 275
2.48
-
3300
... More
Supply and laying and 15mm gauge Brick Ballast compacting with fine sand as 1st class beding cradle below the pipe in 15 cm thickness and up to 10 % hight of pipe on either side.
5.94
-
1000
... More
Clas-150 brick work with 1:3 cement and coarse sand in foundation and plinth including supply of all materials labour and T&P etc. Requuired for proper completion of work as per S.I No. 305(b)
11.04
-
4700
... More
Struck pointing in 1:2 cement and fine sand mortar on brick work including supply of all materials, labour and TandP etc Requuired for proper completion of work as per S.I No. 574.
28.52
-
129
... More
Supply & laying of 600mm dia NP3 hume pipe including fixing of collar with 1:2 cement mortar.
15
-
2214
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements