Public Works Department Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date28 Feb 2025
Closing Soon7 Mar 2025
Tender Amount₹ 1,33,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Carted earthwork upto 1.00 km)

323

180

58140

... More
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete asper MORT&H specficatin clause no.401.

180

4100

738000

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. As per clause no. 406

330

4380

1445400

... More
(1) Emulsion Treated Aggregate Base (Wet Mix Macadam+Cement + Emulsion) As per MORTH Second revision 2019 Providing, laying and spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC cement and 3.50% Emulsion in uniform single layer on sub/ subgrade and compacting with the road roller to achieve the desire density.

180

8450

1521000

... More
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

1815

9

17242.5

... More
Providing and laying bituminous concrete with higher capacity batch type hot mix plant 120 TPH using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Grading-II.(Rate Including Bitumin VG-30)

72.9

12200

889380

... More
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 310 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per specification clause no. 602.

140

8000

1120000

... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.asper MORT&H specficatin clause no.2100.

55

6100

335500

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications.(Grade M20) asper MORT&H specficatin clause no.1500,1700 &2200.

144

7100

1022400

... More
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.asper MORT&H specficatin clause no.1600.

14

73000

1022000

... More
Brick Masonry Work in Cement Mortar 1:3 in sub strructure complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.asper MORT&H specficatin clause no.1300.

10

7300

73000

... More
Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .

12.5

8400

105000

... More
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications asper MORT&H specficatin clause no.1300 &2200.

25

75

1875

... More
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications asper MORT&H specficatin clause no.1300 & 2200

1.9

145

275.5

... More
Providing and Laying of Rubber Moulded Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504.

1350

825

1113750

... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.PCC Grade M15

47

6950

326650

... More
Reinforced cement concrete M-15 grade Kilometer Stone of standard design as per IRC:8 ,fixing in position including painting and printing etc.

1

2600

2600

... More
Reinforced cement concrete M-15 grade Hectometer Stone of standard design as per IRC:8 ,fixing in position including painting and printing etc.

3

700

2100

... More
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811

80

3100

248000

... More
Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance of road signs, speed breakers, standing tree adjacent to road wherever required, maintenance of 200m (hectometre stone) and kilometre stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1- 2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/C- OPRMC/MUL-2023-24 dated 17.02.2024) (I) Maintenance of First Year (@0% of Total Work Amount of 1 to 30)

1

-

-

... More
Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance of road signs, speed breakers, standing tree adjacent to road wherever required, maintenance of 200m (hectometre stone) and kilometre stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1- 2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/C- OPRMC/MUL-2023-24 dated 17.02.2024) (II) Maintenance of Second Year (@0.25% of Total Work Amount of 1 to 30)

1

32067

32067

... More
Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance of road signs, speed breakers, standing tree adjacent to road wherever required, maintenance of 200m (hectometre stone) and kilometre stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1- 2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/C- OPRMC/MUL-2023-24 dated 17.02.2024) (III) Maintenance of Third Year (@0.50% of Total Work Amount of 1 to 30)

1

64133

64133

... More
Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance of road signs, speed breakers, standing tree adjacent to road wherever required, maintenance of 200m (hectometre stone) and kilometre stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1- 2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/C- OPRMC/MUL-2023-24 dated 17.02.2024) (IV) Maintenance of Fourth Year (@0.75% of Total Work Amount of 1 to 30)

1

96200

96200

... More
Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance of road signs, speed breakers, standing tree adjacent to road wherever required, maintenance of 200m (hectometre stone) and kilometre stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1- 2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/C- OPRMC/MUL-2023-24 dated 17.02.2024) (IV) Maintenance of Fifth Year (@1.00% of Total Work Amount of 1 to 30)

1

128266

128266



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.