If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date23 Sep 2024
Closing Date28 Sep 2024
Tender Amount₹ 27,81,845
Costs
EMD
₹ 2,80,000Document Cost
₹ 944Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEAGR_958289_2Tender No
852 dt. 10.09.24 t1Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
constrcution of parar kabarai road to ramadevi mandir tak road
BOQ Items
Cement treded Base Provindin, Laying and spreading materila on a prepared surface, subgrade adding cement OPC @ 4 per cent by weight to the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to the achieve the desired unconfined compressive strength and to form a layer of base..Including All Taxes But Excluding GST
288.75
1039500
3600
Providing and applying tack coat with Bitumen (VG-10) using Bitumen pressure distributor at the rate of 0.35 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.Including All Taxes But Excluding GST
2062.5
33000
16
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 11.2 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.Including All Taxes But Excluding GST
2062.5
321750
156
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. Including All Taxes But Excluding GST
2062.5
111375
54
Excavation in foundation in ordinary soil (Loam, Clay or Sand) including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches. Including All Taxes But Excluding GST
30
4050
135
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work. in Foundation and floors. Including All Taxes But Excluding GST
1.7
9350
5500
Providing and laying of 40 mm gauge Stone balast /Brick Work under Hume pipe culvert foundation & road work including all materials, labour and T&P etc. required for completion of work.Including All Taxes But Excluding GST
6.5
8450
1300
Class-150 (Non Modular) brick work in 1:3 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. Including All Taxes But Excluding GST
11
60500
5500
Pointing on brick work on eadge floor with cement mortar 1:2 Ruled Pointing (1cement :2 Fine sand) Including All Taxes But Excluding GST
24
3840
160
12mm Cement plaster with cement mortar in proportion of 1:3 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm in girth and finished even and smooth. Including All Taxes But Excluding GST
4
780
195
Providing and Laying and fixing of N.P.-3 Hume pipe in proper position as directed by E/I including cartage of pipes/collars upto 30m distance. Including cost of pipes/collars. 350mm Dia, Including All Taxes But Excluding GST.
7.5
10875
1450
Providing Laying and fixing of N.P.-3 Hume pipe in proper position as directed by E/I including cartage of pipes/collars upto 30m distance. Including cost of pipes/collars. 600mm Dia. Including All Taxes But Excluding GST.
7.5
17625
2350
PART-B MAINTENANCE WORK
Maintenance Work for Second year
12
19407
1617.33
Maintenance Work for Third year
12
38816
3234.67
Maintenance Work for Fourth year
12
58224
4852.08
Maintenance Work for Fifth year
12
77633
6469.42
1- Cost of Maintenance of Road for Five Years will be paid as per E.N.C. Letter no.- 3689lh0-PRMC/ewy&23-24 Dt. 17.02.2024.)
2- The departmental road roller if spare, shall be made available to the contractor at site @ Rs. 2500 per day including POL charges, wages of driver and cleaner. If roller is kept idle due to non-availability of material or labour, recovery @ Rs. 2500 per day shall be made from contractor’s bill for idle period.
-
-
-