If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date9 Dec 2024
Closing Date9 Jan 2025
Tender Amount₹ 39,00,000 
Notes
Download

Costs

Summary

Reconstruction Work Of Rahmatganj Karimpur Road Transferred From Sugarcane Department Under The Financial Year 2023-24

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 to required line, grade and….............. as per Technical Specification Clause 508. (Including all T&P, Labour, Material, Royalty, Tax but excluding GST)

3660

162

592920

... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510 ( By Mechanical Means) (Including all T&P, Labour, Material, Royalty, Tax but excluding GST)

3660

55

201300

... More
Brick (SOB) on end pavement on patries laid and dry joints filled with local sand including preparation of base to proper slope & its….....all materials labour and T&P etc. required for proper completionof the work.. (Including all T&P, Labour, Material, Royalty, Tax but excluding GST)

400

488

195200

... More
Plain cement concrete 1:4:8 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Sor No 281 (Including all T&P, Labour, Material, Royalty, Tax but excluding GST)

0.25

6700

1675

... More
Brick work M-150 (1:3) cement mortar.Sor No 307 (Including all T&P, Labour, Material, Royalty, Tax but excluding GST)

14

5300

74200

... More
Struck pointing with cement and fine sand of 1.25 F.M. in ratio of 1:3 on brick work.As Item no 574 (Including all T&P, Labour, Material, Royalty, Tax but excluding GST)

32

85

2720

... More
Earth work in excavation of foundation of structures as per drawing and technical specification,Clause 304 including…................. of sides and bottom and backfilling with approved material. (Including all T&P, Labour, Material, Royalty, Tax but excluding GST)

20

79

1580

... More
First Year Maintainance (@0% of Total Work Amount of S.No. 1 to S.No.10)

1

-

-

... More
Second Year Maintainance (@0.75% of Total Work Amount of S.No. 1 to S.No.10)

1

27892

27892.24

... More
Third Year Maintainance (@1.50% of Total Work Amount of S.No. 1 to S.No.10)

1

55784

55784.48

... More
Fourth Year Maintainance (@2.25% of Total Work Amount of S.No. 1 to S.No.10)

1

83676

83676.71

... More
Fifth Year Maintainance (@3% of Total Work Amount of S.No. 1 to S.No.10)

1

111568

111568.95



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.