Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date1 Feb 2024
Closing Date6 Feb 2024
Tender Amount₹ 52,00,000
Costs
EMD
₹ 4,60,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEALD_888202_21Bid Award Id
ViewTender No
11880/10COM.P-PRJ.CIRCLE/23 DATED 18.12.2023Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per MORD Technical Specification Clause 405
281.25
791718
2815
... More
Prime coat Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. As per MORD Technical Specification Clause No. 502 (Including Cost of Emulsion)
3750
135000
36
... More
Tack coat Providing and applying tack coat with bitumen (VG-10) using Bitumen distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular base surface cleaned with mechanical broom. As per MORD Technical Specification Clause No. 503 (Including Cost of Bitumen)
3750
56250
15
... More
20mm thick Open-Graded Premix Carpet using Bituminous Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen VG-10 required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. As per MORD Technical Specification Clause No. 508 (Including Cost of Bitumen)
3750
596250
159
... More
Seal Coat - Type C (Mechanical Method) Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C seal coat. As per MORD Technical Specification Clause No. 510 with Bitumen Binder VG-10 (Including Cost of Bitumen)
3750
202500
54
... More
Brick Edging Brick edging on both sides of the road of brick class M-150, 8 cm wide and 12 cm deep laid with mud mortar including labour & supply of bricks finished to required template and in proper alignment and also including dressing & ramming athe excavated earth as directed by the engineer incharge of the work including material labour & T&P etc for proper completion of work. but bond edging both side and road. SOR No. 766
1
69160
69160
... More
Earthwork in excavation for structures as per drawing and technical specification Clause 305.1 including setting our construction of shoring and bracing removal of stumps and other deleterious material and disposal up to a lead of 50 m dressing of sides and bottom and backfilling in trenches with excavated suitable material. As per MORD Technical Specification Clause No. 300
35.9
3159
88
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and as per MORD technical specification Clauses 802, 803,1202, 1203
6.9
36259
5255
... More
Brick masonry work in (1:3) cement coarse sand mortar in substructure complete excepting pointing and plastering, as per drawing and as per MORD technical specification No. 1300 & 2200
29.3
186055
6350
... More
Pointing with cement mortar (1:3) on brickwork/ C.R. Stone masonry as per drawing and as per MORD technical specification Clause 613.3 and 1204
33
2277
69
... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork/ C.R. Stone masonry in substructure as per MORD technical specification Clauses 613.4 & 1204
7.4
1332
180
... More
Providing and laying reinforced cement concrete pipe NP3 culvert on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works. Backfilling, concrete and masonry works in head wall parapets Clause 1106. 600 mm dia
7.5
13687
1825
... More
Providing and laying reinforced cement concrete pipe NP3 culvert on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works. Backfilling, concrete and masonry works in head wall parapets Clause 1106. 900 mm dia
7.5
28837
3845
... More
Providing and laying reinforced cement concrete pipe NP3 culvert on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works. Backfilling, concrete and masonry works in head wall parapets Clause 1106. 350 mm dia
15
15150
1010
... More
Construction Work Cost (Total of SI. No. 1 to 17)
1
4538755
4538755.2
... More
B- Routine Maintenance Amount after Completion of Construction work. (Amount for 5 Year)
0.08
340406
4538755.2
... More
1st Year Maintenance Charge @ 0.00% on Construction cost of works
-
-
4538755.2
... More
2nd Year Maintenance Charge @ 1.00% on Construction cost of works
0.01
45387
4538755.2
... More
3rd Year Maintenance Charge @ 1.50% on Construction cost of works
0.02
68081
4538755.2
... More
4th Year Maintenance Charge @ 2.00% on Construction cost of works
0.02
90775
4538755.2
... More
5th Year Maintenance Charge @ 3.00% on Construction cost of works
0.03
136162
4538755.2