Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date8 Nov 2024
Closing Soon28 Nov 2024
Tender Amount₹ 13,95,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, laying and rolling of open - graded premix surfacing of 20 mm compacted thickness with 13.2 mm crushed stone grit @ 0.18cum/10sqm and 11.2 mm size crushed stone grit @ 0.09cum/10sqm from approved quarry and bitumen @ 1.46Kg/sqm to required line, grade and level to serve as wearing course on a previously prepared base, also mixing in a suitable plant or by mixall, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades, including cost of material, labour, plant, machinery and T&P. Complete as per MORD Specification No.508(II) .including the cost of bitumenVG-10, Labour T&P etc.(Excluding GST)

2700

180

486000

... More
Providing and laying seal coat type-C sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using 6.5 mm crushed stone grit @ 0.09cum/ 10sqm from approved quarry and bitumen/emulsion @0.65kg/sqm including cost of material, labour, plant, machinery, mixall and T&P. Complete as per MORD Specification No.510(ia) including the cost of bitumen VG-10, Labour T&P etc.(Excluding GST)

2700

62

167400

... More
Construction of sub grade and earthen shoulders with approved materials obtained from borrow pits with all lifts and leads, transporting to stite, spreading, grading to required slope and compacted to meet requirement of table no. 300-2 with lead upt 1000m as per Technical specification cluase 303.1 .as per direction of E/I incluidng labour cess,Royalty (Excluding GST)

250

60

15000

... More
Routine Maintenance Amount after completion of PC works (Amount for 5 years)

-

-

-

... More
1st Year Maintenance Charge @ 0% on this works.

1

-

-

... More
2nd Years Maintenance Charge @ 1.50% on this works.

1

11317

11317.5

... More
3rd Years Maintenance Charge @ 3.00% on this works.

1

22635

22635

... More
4th Years Maintenance Charge @ 4.50% onthis works.

1

33952

33952.5

... More
5th Years Maintenance Charge @ 6.00% on this works.

1

45270

45270

... More
CC work

-

-

-

... More
Providing, laying, spreading and compacting stone aggregates of 53-22.4 mm sizes to water bound macadam G-3 specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 80-100 KN in stages to proper grade and camber, applying and brooming requisite type-B of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density for Grading 3 as per MORD Specification.405 incluidng labour cess,Royalty. Quarry from Shankargarh (Excluding GST)

15

3400

51000

... More
Construction of un-Reforced, dowel jointed at expension and construction joint only, plain cement concrete pavement, thickness as per desingn, over a prepared sub base, with 43 grade cement or any other type as per clause 1501-2.2 M30 Grade, coarse and fine aggregate conforming to IS 383 macadam size of coarse aggregate not exceeding 25mm mixed in a concretee mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polthene film, wedges, steel plates including leveliing the formwork as per drawing), spreading the concrete with showels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provisiion of contraction and expansion, construction joints, applying, deboinding strips, primer sealant, dowel bars, near approaches to bridge/ culvert and construction joints admixtures as approved, curing of concrete slabs for 14-days curing compound where specifed and water finishing to lines and grade as per drawing and technical specification on clause 1501 (Excluding GST)

45

8200

369000

... More
Construction of sub grade and earthen shoulders with approved materials obtained from borrow pits with all lifts and leads, transporting to stite, spreading, grading to required slope and compacted to meet requirement of table no. 300-2 with lead upt 1000m as per Technical specification cluase 303.1 .as per direction of E/I incluidng labour cess,Royalty (Excluding GST)

60

60

3600

... More
Routine Maintenance Amount after completion of CC works (Amount for 5 years)

-

-

-

... More
1st Year Maintenance Charge @ 0% on this works.

1

-

-

... More
2nd Years Maintenance Charge @ 0.25% on this works.

1

1059

1059

... More
3rd Years Maintenance Charge @ 0.50% on this works.

1

2118

2118

... More
4th Years Maintenance Charge @ 0.75% onthis works.

1

3177

3177

... More
5th Years Maintenance Charge @ 1.00% on this works.

1

4236

4236



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.