Public Works Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date16 Apr 2025
Closing Date23 Apr 2025
Tender Amount₹ 8,20,00,000
Costs
EMD
₹ 16,40,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEALG_1028750_1Bid Award Id
ViewTender No
2452/Cashier(PDH)-AC/25-26 Dt. 03-04-25Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing, laying and spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC Cement and 3.50% Emulsion in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
3075
-
-
... More
Providing and applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.20 Kg per sqm on the prepared bituminous surface cleaned with mechanical broom.(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
31500
-
-
... More
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects(Excluding Cost of GST)(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
1210
-
-
... More
Construction of un-reinforced, dowel jointed, grade cement concrete pavement over a prepared sub base with 43 grade cement, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or Concrete paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, temprature reinforced, admixtures as approved, curing compound, finishing to lines and grades as per drawing. (Excluding reinforcement) as per MORTH Specification 602 S.No. No. 6.02 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
1300
-
-
... More
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 Carted earth (Excluding Cost of GST)(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
870
-
-
... More
Earth work in excavation in ordinary soil. (Ch-4, SI 251) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
800
-
-
... More
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 Coarse sand : 8 graded stone aggregate 40 mm nominal size) including supply of all material, labour and T&P etc. required for proper completion of the work.(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
210
-
-
... More
Providing and laying cement concrete in 1:1.5:3 (1 Cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) including supply of all material, labour and T&P etc. required for proper completion of the work. In Foundation and floors. Ch. 5 Sr. 7(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
430
-
-
... More
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation Complete as per Drawing and Technical Specification as per MORTH Clause 15.13(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
270
-
-
... More
Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches by Hydraulic excavator/manual means. For Building/ Drain work only. As Per SOR 4.1.1 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
50
-
-
... More
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 Coarse sand : 8 graded stone aggregate 40 mm nominal size) including supply of all material, labour and T&P etc. required for proper completion of the work. In Foundation and floors. As Per SOR 275(a) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
10
-
-
... More
Providing and laying of 40 mm gauge B/B under Hume pipe culvert foundation in road work including all materials, labours, T&P etc. required for completion of the work. As Per SOR 20-18(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
30
-
-
... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation-150 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) As Per SOR 6.1.1(i) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
45
-
-
... More
Supply and Laying of 350 mm dia NP-3 Hume Pipe including 15%Transportation Charges includin all materials, Labour, T&P etc. complete as per requirements of Site. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) For 350 mm dia
22.5
-
-
... More
Supply and Laying of 600 mm dia NP-3 Hume Pipe including 15%Transportation Charges includin all materials, Labour, T&P etc. complete as per requirements of Site. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) For 600 mm dia
15
-
-
... More
Supply and Laying of 900 mm dia NP-3 Hume Pipe including 15%Transportation Charges includin all materials, Labour, T&P etc. complete as per requirements of Site. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) For 900 mm dia
22.5
-
-
... More
Ruled Pointing on brick work with cement mortar of mix 1:3 (1Cement : 3 Fine Sand) SOR SI No. 574A(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
95
-
-
... More
12 mm cement plaster on brick work with cement mortar of mix (upto 10 mtr height from Ground level) 1:4 (1 cement : 4 Coarse sand) As Per SOR 13.4.1 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
6.5
-
-
... More
White washing with lime on undecorated wall surfaces (Two coats) to give an even shade including thoroughly brooming the surface to remove all dirt, dust mortar drops and loose scales of lime wash and other foreign matters. As Per SOR 672 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
94
-
-
... More
Dismentaling brick work, stone work or R.C.C. work in lime of cement mortar and including stacking of materials as directed by the Engineer-In-Charge with a distance of 60m. S.I. No. 692(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
130
-
-
... More
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per MORTH Specification No. 304 12.01 (i) B (ii) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
130
-
-
... More
Plain Cement Concrete (M-20) in Open Foundation complete as per Drawing and Technical Specifications. (PCC Grade M20) as per MORTH Clause 12.08 (B Case-II) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
18
-
-
... More
Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (RCC Grade M25) as per MORTH Clause 12.08 (E Case-II) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
38
-
-
... More
Reinforced Cement Concrete in SUB-STRUCTURE complete as per Drawing and Technical Specifications. (RCC Grade M25) as per Clause 13.05 (F (p)) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
88
-
-
... More
Furnishing and Placing Reinforced/ Prestressed cement concrete in SUPER-STRUCTURE as per drawing and Technical Specification (RCC Grade M25) as per Clause 14.01 (B Case II) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
55
-
-
... More
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation Complete as per Drawing and Technical Specification as per MORTH Clause 15.13(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
19850
-
-
... More
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
36
-
-
... More
Providing and laying of Hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @250 gms per sqm area thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC 35. The finished surface to be level, uniform and free from streaks and holes.(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
1490
-
-
... More
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
22
-
-
... More
Lettering and painting with emamal paint (renewal coat) including cost of material, labour and T&P etc complete. (Ch-26, SI No. 10)(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) Hectometer
28
-
-
... More
Lettering and painting with emamal paint (renewal coat) including cost of material, labour and T&P etc complete. (Ch-26, SI No. 10)(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)Km. Stone (Ordinary)
8
-
-
... More
Lettering and painting with emamal paint (renewal coat) including cost of material, labour and T&P etc complete. (Ch-26, SI No. 10)(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) Km. Stone (5th)
1
-
-
... More
Part-A (Bituminous Work) 05 Year Maintenance Charge @ 7.50%)
Routine Maitenance of road for 05 Years after the completion of work (Vide shasanadesh No. 17/2024/सा0-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & letter No. 36890C/RMC/Mool-23-24 Dated 17.02.2024 of ENC PWD. Rate Excluding of G.S.T.)
1-1st Year @ Nill
1
-
-
... More
2nd Year @ 0.25%
1
-
-
... More
3rd Year @ 0.50%
1
-
-
... More
4th Year @ 0.75%
1
-
-
... More
5th Year @ 1.00%
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements