If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date5 Nov 2024
Closing Soon30 Dec 2024
Tender Amount₹ 78,94,000 
Notes
Download

Costs

Summary

Special Repair Of Elna-khanpur Road (odr) In Km 4(925), 5(945), 6(660) 7(570)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B seal coat. Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST.

7950

55

-

... More
Earth work in Embankment (For Patri) with ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in patries should be including ramming and dressing the surface to required levels and slopes as directed by the Engineer incharge. as per S.I. No. 253 a Including cost of, all material, Bitumen, labour, T&P, royality , all taxes and labour cess complete. But excluding GST.

1050

100

-

... More
Supply and fixing of 350 mm dia NP3 type Hume Pipe S&S in position including labour and T&P etc. required for proper completion of work. Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST.

15

2415

-

... More
Part (B) CC Part Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel steel/ vibratory roller in stages to proper grade and camber, applying and brooming requisite type screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.

67

4450

-

... More
Construction of un-reinforced, expansion and construction joint only, plain cement concrete pavement, thickness as per disign, over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 (M 30 Grade) coarse and fine aggregates confirming to IS 383 maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints as per norms, applying debonding strips primer, sealant, near approaches to bridge/ culvert and construction, joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 including Cost of Polythene Sheet and also including complete shifting of matrials & Concrete etc. SOR 2014 (b). Including complete shifting of matrials & Concrete etc and cost of all material, labour, T&P, royality, all taxes and labour cess complete . But excluding GST.

254

8280

-

... More
Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplusearth as directed by the Engineer-in-charge upto a distance of 30 M. from the foundation trenches. (Where machine can not reach/move). SOR ITEM No. 251 (a) Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST.

500

110

-

... More
Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 6:3:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. SOR Item No. 280 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.

68

6400

-

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications RCC Grade M20 With Batching Plant, Transit Mixer and Manual placing Including cost of all labour, T&P, royalty, Labour cess and all taxes complete but excluding GST.

142

8100

-

... More
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. Including cost of all labour, T&P, Labour cess and all taxes complete but excluding GST.

8.5

80000

-

... More
Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M.in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.50 M. lift and 30 M. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 M distance including mechanically compected to achieve 95% proctors density including arrangement of water, settlement and all T&P charges including roller and its fuel charges (Roller charges accounted for @ 1700.00 per day with diesel for output of 325 cum per day) as directed by the Engineer incharge. excluding Royallity. Wherever applicable for small work or Abadi area. (Where machine con not reach/move) SOR Ch.-4 New Item-2 Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST.

290

200

-

... More
Cost of maintenance for Bituminous work portion for IInd Year @ 1.50% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per Prevailing GO

2602325

-

-

... More
Cost of maintenance for Bituminous work portion for IIIrd Year @ 3.00% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per Prevailing GO

2602325

-

-

... More
Cost of maintenance for Bituminous work portion for IVth Year @ 4.50% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per Prevailing GO

2602325

-

-

... More
Cost of maintenance for Bituminous work portion for Vth Year @ 6.00% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per Prevailing GO

2602325

-

-

... More
Cost of maintenance for Cement Concrete work portion for IInd Year @ 0.25% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO

4779670

-

-

... More
Cost of maintenance for Cement Concrete work portion for IIIrd Year @ 0.50% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO

4779670

-

-

... More
Cost of maintenance for Cement Concrete work portion for IVth Year @ 0.75% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO

4779670

-

-

... More
Cost of maintenance for Cement Concrete work portion for Vth Year @ 1.00% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO

4779670

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.