Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date17 Jan 2025
Closing Soon31 Jan 2025
Tender Amount₹ 93,50,000
Costs
EMD
₹ 6,67,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEGKP_987504_2Tender No
8202/135C-Gkp Circle/2024 Dated 07-12-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Tack Coat
Providing and applying tack coat with bitumen (VG-10)using bitumen pressure distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Speicification Clause 503 including cost of bitumen (VG-10).(MoRD Sl. no. 5.2 and Specification no. 503), (including Labour cess and Cost of Bitumen VG-10), (GST will be paid extra as applicable).
6180
17
105060
... More
20mm Thick Open Graded Premix Carpet using Bituminous
Providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously Prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kN static roller capacity finished to required lavel and grades to be followed by seal coat as per Techincal Specification clause 508. (MoRD Sl. no. 5.9 and Specification no. 508), (including Labour cess, royalty and Cost of Bitumen VG-10), (GST will be paid extra as applicable).
6180
215
1328700
... More
Seal Coat (Type-C)
Providing and applying seal coat type "C" comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kN Static roller and finishing to required level and grades as per Technical Specification Clause 510 including cost of bitumen.(MoRD Sl. no. 5.12 and Specification no. 510), (including Labour cess, Royalty and Cost of Bitumen VG-10) (GST will be paid extra as applicable).
6180
75
463500
... More
Construction of subgrade and earthen shoulders
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (MoRD Sl. no. 3.14 and Specification no. 303.1), (including Labour cess), (GST will be paid extra as applicable).
1100
95
104500
... More
Excavation of Foundation in ordinary soil (Ioam clay or sand) including lift upto 1.50 meter and lead up 30meter and including filling, watering and ramming of excavated earth into trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer in charge up to a distance of 30 meters from the foundation trenches. (Excluding Royalty) as per S.I. No. 251. (Including Labour Cess), (GST will be paid extra as applicable).
26
120
3120
... More
Concrete with 4cm (1.5"). Gauge brick ballast, fine sand of 1.25 fineness modulous and cement in proportion of 1:4:8 in foundation and under floor, including supply of all materials, labour and T&P etc. required for proper completion of the work, As per S.I.No.-275. (Including Labour Cess and Royalty), (GST will be paid extra as applicable).
1.5
3635
5452.5
... More
Cement concrete with 2.0 cm gauge approved stone grits, approved coarse sand and cement in proportion of 4:2:1 including supply of all materials, labour and T&P etc. required for the proper completion of the work, As per S.I.No.-279(i).(Including Labour Cess and Royalty), (GST will be paid extra as applicable).
1.85
6520
12062
... More
Class 150 Sub class 'A' brick work in 1:4 cement and coarse sand of 1:25 fineness modulous mortar in foundation and plinth, including supply of all materials labour and T & P etc. required for the proper completion of the work. As per S.I. No. 305. (Including Labour Cess and Royalty), (GST will be paid extra as applicable).
12
4555
54660
... More
Struck pointing with cement mortar consisting of one part of cement and two parts of fine sand of 1.25 fineness modulous on brick work including raking the joints washing and cleaing and supply of all matreials labour and T&P required for the proper completion of the work.as per S.I. no. 574.(Including Labour Cess and Royalty), (GST will be paid extra as applicable).
35
175
6125
... More
Supply and Laying of 600 mm dia. NP3 RCC Hume Pipe complete as per direction of E/I. (Including Labour Cess), (GST will be paid extra as applicable).
7.5
2450
18375
... More
Supply and Laying of 350 mm dia. NP3 RCC Hume Pipe complete as per direction of E/I. (Including Labour Cess), (GST will be paid extra as applicable).
15
1400
21000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%