Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date23 Oct 2024
Closing Date6 Nov 2024
Tender Amount₹ 31,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Seal Coat Type C :- Providing and laying seal coat sealing the voids in a bituminous VG-10, surface laid to the specified levels, grade and cross fall using Type C as per Mord S.N.-5.12 Technical Specification Clause 510 (Including cost of Bitumen & labour cess) (GST will be paid extra as applicable)

1087.5

72

78300

... More
Cement Concrete Pavement Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501) (GST will be paid extra as applicable)

230

9800

2254000

... More
Earth work Earth work cutting or in embankment to oridinary soil, excavation to be in the from of regular pits not exceeding 0.5m in depth and earthwork in embankment to be in 20cm. layers, including ramming and dressing the surface to required levels & slopes & also including 1.5m. lift & 30m. lead The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m. distance as directed by the engineer-in-charge (Excluding Royalty) as per SI. No. 253 (GST will be paid extra as applicable)

100

100

10000

... More
For 5 Years maintenance work 1st Year cost of BOQ @ 0%

1

-

-

... More
2nd Year cost of BOQ @ 1.50% In Itme no. 2 to 4, 6 and @ 0.25% in Item No. 1 & 5

1

11566

11566.66

... More
3rd Year cost of BOQ @ 3% In Itme no. 2 to 4, 6 and @ 0.50% in Item No. 1& 5

1

22533

22533.31

... More
4rth Year cost of BOQ @ 4.50% In Itme no. 2 to 4, 6 and @ 0.75% in Item No. 1& 5

1

34699

34699.97

... More
5rth Year cost of BOQ @ 6% In Itme no. 2 to 4, 6 and @ 1.00% in Item No. 1 & 5

1

46266

46266.63



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.