Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date20 Nov 2024
Closing Date5 Dec 2024
Tender Amount₹ 72,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in Excavation in trenches for foundations pipes cable etc in ordinary soil (Loam clay or sand) including lift upto 1.5 m. lead upto 50m and dressing of sides and rammings of bottom and disposal of surplus exdavated earth as directed by the Engineer I/C within a lead of 30 m. (SOR 251)

440

140

61600

... More
Providing and laying Cement concrete 1:4:8 (1 cement : 4 fine sand : 8 Brick Ballast 40 mm. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. (SOR 275)

110

4350

478500

... More
Brick work in 1:4 cement and coarse sand mortar including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete. (SOR 305b)

154

5390

830060

... More
25 mm thick CC in flooring in 1:2:4 without Base Flooring including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete. (SOR 601)

891

340

302940

... More
12mm thick plaster in 1:2 cement and Coarse sand mortar including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete (SOR 583)

660

190

125400

... More
Providing and laying Cement concrete 1:2:4( 1 cement : 2 coarse sand : 4 graded stone ballast ballast 20mm nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in founation adn floors. (SOR 279b)

27.5

7950

218625

... More
Mild steel or iron in plan work shch as reinforced concrete or reinforced brick work(when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorized overlapping shall be measured up to floor two level. (SOR 504)

21.5

7500

161250

... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 1St Year Maintenance Cost @ Charge - 0.00% (Total Cost of Item nos. 1 to 10)

1

-

-

... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 2nd Year Maintenance Cost @ 0.25% (Total Cost of Item nos. 1 to 10)

1

18098

18098.81

... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 3rd Year Maintenance Cost @ 0.50% (Total Cost of Item nos. 1 to 10)

1

36197

36197.63

... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 4th Year Maintenance Cost @ 0.75% (Total Cost of Item nos. 1 to 10)

1

54296

54296.44

... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 5th Year Maintenance Cost @ 1.00% (Total Cost of Item nos. 1 to 10)

1

72395

72395.25



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.