Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date23 Dec 2024
Closing Date3 Jan 2025
Tender Amount₹ 8,25,00,000
Costs
EMD
₹ 16,50,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEALD_986028_2Bid Award Id
ViewTender No
11710/06com(3)-prcir/2024 dt. 13-12-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Tack coat Providing and applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (as per MORTH specification clause No. 503)
53625
-
-
... More
Bituminous Concrete Providing and laying bituminous concrete with 100 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
2145
-
-
... More
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. (as per MORTH specification clause No. 304 B )
264
-
-
... More
PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (as per MORTH specification clause No. 2100 )
66
-
-
... More
R.C.C. grade M 20 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M20 using batching plant transit mixer & Concrete pump (as per MORTH specification S.No. 12.8 Case I )
176
-
-
... More
Reinforcement work(Substructure) Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and as per MORTH specification clause No. 1600)
110
-
-
... More
The Maintenance Cost will be provided for five years @2.50 percent.(The Maintenance Cost will be calculated as per actual executed construction cost at the time of final bill) 1st Year maintenance cost @0.00 percent and 2nd Year maintenance cost @0.25 percent
3384
-
-
... More
3rd Year maintenance cost @0.50 percent
3384
-
-
... More
4th Year maintenance cost @0.75 percent
3384
-
-
... More
5th Year maintenance cost @1.00 percent
3384
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements