Public Works Department Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date5 Jun 2021
Closing Date11 Jun 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construciton of un - reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base with 43 grade (O.P.C.) cement or any other type as per Clause 1501.2.2 (1:1.5:3) coarse and fine aggregates confirming to IS 383 maximum size of coarse aggregate not exceeding 25 mm mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side from work (steel channel, laying and fixing, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints as per norms, applying debonding strips primer, sealant, dowel bars, near approaches to bridge/culvert and construction, joints, admixtures as approved, curing of concrete slabs for 14 days, curing compound (Where specified) and water finishing to lines and grade as per drawing and Technical Polythene sheet and dowel bar and also including complete shifting of materials & Concrete etc including cost of material, labour, Tools & Plants, labour cess, royality and all taxes etc. but excluding cost of GST as required for propor complition of the work directed by Engineer in charge.

112

-

7000

... More
Construction of embankment with approved material obtained from borrow pits with all lift and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-2 as per MORD Specification Clause 303.1 including cost of material, labour, labour cess, T&P, royalty and all taxes but excluding GST required for proper completion of work as per direction of engineer-in-charge.

49

-

110

... More
Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in embankment to be in 20 cm. layers including ramming and dressing the surface ti required levels and slopes and 30M. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 M. Distance as directed by E.I. including cost of material, labour, labour cess, T&P, royalty and all taxes but excluding GST required for proper completion of work as per direction of engineer-in-charge.

250

-

90



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.