Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date26 Dec 2023
Closing DateCancelled
Tender Amount₹ 1,60,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Reconstruction work of 1st part of Khempur to Bhot Bakkal road.

60

246000

4100

... More
Reconstruction work of 2nd part of Khempur to Bhot Bakkal road.

78

319800

4100

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (Including all T&P, Labour, Material, Tax but excluding GST)

1

-

-

... More
Reconstruction work of Thothar Marg from Rampur Swar Road.

8

27200

3400

... More
Providing, laying, spreading and compacting stone aggregate of specific size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to required density Grading 2 as per Technical Specification Clause 405 (Including all T&P, Labour, Material, Tax but excluding GST)

1

-

-

... More
Reconstruction work of Thothar Marg from Rampur Swar Road.

47

192700

4100

... More
Reconstruction work of village Ataria to Majra Ataria road.

27

110700

4100

... More
Providing, laying and spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC cement and 3.5% Emulsion (SS-2) in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density. (Including all T&P, Labour, Material, Tax but excluding GST)

1

-

-

... More
Reconstruction work of Thothar Marg from Rampur Swar Road.

525

3780000

7200

... More
Reconstruction work of village Ataria to Majra Ataria road.

180

1296000

7200

... More
Reconstruction work of 1st part of Khempur to Bhot Bakkal road.

300

2160000

7200

... More
Reconstruction work of 2nd part of Khempur to Bhot Bakkal road.

150

1080000

7200

... More
Providing and applying tack coat with VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer/Bituminous surface as per Technical Specification Clause 503. (Including all T&P, Labour, Material, Tax but excluding GST)

1

-

-

... More
Reconstruction work of Thothar Marg from Rampur Swar Road.

5250

78750

15

... More
Reconstruction work of village Ataria to Majra Ataria road.

1800

27000

15

... More
Reconstruction work of 1st part of Khempur to Bhot Bakkal road.

3000

45000

15

... More
Reconstruction work of 2nd part of Khempur to Bhot Bakkal road.

1500

22500

15

... More
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508. Case - I By Manual Means (I) (Including all T&P, Labour, Material, Tax but excluding GST)

1

-

-

... More
Reconstruction work of Thothar Marg from Rampur Swar Road.

5250

892500

170

... More
Reconstruction work of village Ataria to Majra Ataria road.

1800

306000

170

... More
Reconstruction work of 1st part of Khempur to Bhot Bakkal road.

3000

510000

170

... More
Reconstruction work of 2nd part of Khempur to Bhot Bakkal road.

1500

255000

170

... More
Providing and laying seal coat by manual means with VG-10 sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 ( By Manual Means) (Including all T&P, Labour, Material, Tax but excluding GST)

1

-

-

... More
Reconstruction work of Thothar Marg from Rampur Swar Road.

5250

341250

65

... More
Reconstruction work of village Ataria to Majra Ataria road.

1800

117000

65

... More
Reconstruction work of 1st part of Khempur to Bhot Bakkal road.

3000

195000

65

... More
Reconstruction work of 2nd part of Khempur to Bhot Bakkal road.

1500

97500

65

... More
Brick edging on both sides of the road of first class (M-150) brick on edge laid with mud mortar including labour and supply of bricks finished to the required templete and in proper alignment and also including dressing and ramming the excavated earth as directed by the Engineer-in-Charge. (Including all T&P, Labour, Material, Tax but excluding GST)

1

-

-

... More
Reconstruction work of Thothar Marg from Rampur Swar Road.

1.75

114625

65500

... More
Reconstruction work of village Ataria to Majra Ataria road.

0.6

39300

65500

... More
Excavation in foundation in ordinary soil with lift upto 1.50 m a lead upto 30m including watering and ramming of excavated earth into the trenches and disposal of surplus earth as directed by the Engineer-in-charge upto a distance 30 m from the foundation.(S.I.No.-251) (Including all T&P, Labour, Material, Tax but excluding GST)

1

-

-

... More
Reconstruction work of Thothar Marg from Rampur Swar Road.

60

10800

180

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Including all T&P, Labour, Material, Tax but excluding GST)

1

-

-

... More
Reconstruction work of Thothar Marg from Rampur Swar Road.

1050

180600

172

... More
Reconstruction work of village Ataria to Majra Ataria road.

360

61920

172

... More
Reconstruction work of 1st part of Khempur to Bhot Bakkal road.

600

103200

172

... More
Reconstruction work of 2nd part of Khempur to Bhot Bakkal road.

300

51600

172

... More
Bricks (S.O.B) on edge pavement on patries laid and dry, joints filled with local sand including preparation of base to proper slope & its ramming. Spreading layer of 1 cm (3/8") depth of local sand over the sub-grade and including supply of all materials labour and T&P etc. required for proper completion of the work. (Including all T&P, Labour, Material, Tax but excluding GST)

1

-

-

... More
Reconstruction work of 1st part of Khempur to Bhot Bakkal road.

600

309000

515

... More
Reconstruction work of 2nd part of Khempur to Bhot Bakkal road.

300

154500

515

... More
Plain cement concrete 1:4:8 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Sor No 281 (Including all T&P, Labour, Material, Tax but excluding GST)

1

-

-

... More
Reconstruction work of Thothar Marg from Rampur Swar Road.

1.2

8064

6720

... More
Laying Reinforced cement concrete Hume pipe NP3 pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2. (Including all T&P, Labour, Material, Tax but excluding GST)

1

-

-

... More
Reconstruction work of Thothar Marg from Rampur Swar Road.

7.5

48000

6400

... More
Brick work in one part cement and three part coarse sand (1:3) mortar in foundation and plinth including supply of all meterials, labour and T&P etc. required for proper completion of work. SOR no. 307 (Including all T&P, Labour, Material, Tax but excluding GST)

1

-

-

... More
Reconstruction work of Thothar Marg from Rampur Swar Road.

13

69030

5310

... More
Struck pointing with cement mortar consisting of 1 part cement and 2 part of the fine sand of 1.25 finenes modulus on brick work including supply of all materials labour and completion of work. SOR 574 (Including all T&P, Labour, Material, Tax but excluding GST)

1

-

-

... More
Reconstruction work of Thothar Marg from Rampur Swar Road.

32

7296

228

... More
Maintainance of First Year (@1% of Total Work Amount of S.No. 1 to S.No.51)

1

155948

155948.35

... More
Maintainance of Second Year (@1.5% of Total Work Amount of S.No. 1 to S.No.51)

1

233922

233922.53

... More
Maintainance of Third Year (@2% of Total Work Amount of S.No. 1 to S.No.51)

1

311896

311896.7

... More
Maintainance of Fourth Year (@2.5% of Total Work Amount of S.No. 1 to S.No.51)

1

389870

389870.88

... More
Maintainance of Fifth Year (@3% of Total Work Amount of S.No. 1 to S.No.51)

1

467845

467845.05



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.