Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date5 Nov 2024
Closing Date13 Nov 2024
Tender Amount₹ 4,51,000
Costs
EMD
₹ 45,000Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEJNS_970791_4Bid Award Id
ViewTender No
1508/T-1 Dt. 22.10.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Excavation in foundation in ordinary soil ( Loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches. (As Per Schedule Item No.-251)
87
120
10440
... More
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8km (5 miles) from the side of work & including watering ,dressing etc. Rate to include cost of all materials,labour and tools & plants,etc. required for proper completion of the work. (As Per Schedule Item No.-255)
7.8
1000
7800
... More
Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 1:4:8 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. (As Per Schedule Item No.-280)
7.8
4300
33540
... More
Class-150 brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. Required for proper completion of the work. (As Per Schedued Item No.-305)
26.4
5300
139920
... More
12 mm thick plaster on brick work not less than 10 mm with cement mortar in proportion 1:4 cement and fine sand of 1.25 F.M. including cost of all material labour, T&P etc. required completion of the work as per direction of the Engineer-in-charge. (As Per Schedule Item No.-584)
39
130
5070
... More
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
110
85
9350
... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. (600 mm dai)
22.5
2650
59625
... More
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 1st year (@0 % of total work amount S.No.1-10)
1
-
-
... More
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 2nd year (@0.25 % of total work amount S.No.1-10)
1
1099
1099
... More
Maintenance Charge including @ Earth work , repair of painted surface, earthwork on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 3rd year (@0.50% of total work amount S.No.1-10)
1
2198
2198
... More
Maintenance Charge including @ Earth work ,repair of painted surface,earthwork on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 4th year(@0.75% of total work amount S.No.1-10)
1
3297
3297
... More
Maintenance Charge including @ Earth work ,repair of painted surface,earthwork on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 5th year (@1.00% of total work amount S.No.1-10)
1
4396
4396.1