Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date5 Nov 2024
Closing Date13 Nov 2024
Tender Amount₹ 26,65,000
Costs
EMD
₹ 2,67,000Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEJNS_970791_8Tender No
1508/T-1 Dt. 22.10.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Excavation in foundation in ordinary soil ( Loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches. (As Per Schedule Item No.-251)
125
120
15000
Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 1:3:6 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. (As Per Schedule Item No.-280)
25
4500
112500
RCC work with cement approved coarse sand and 2cm. (3/4'') gauge approved stone ballast in the proportion 1:2:4 in lintels of doors and windows, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.I wire.and including necessary cantering and suttering etc and also including supply of all materials,labour and tools and plants etc. required for proper completion of the work. binding wire to be supplied by the contractor free of cost. As in item (283) above but in RCC T-beam and slab roof in 1.1.5.3 (As Per Schedule Item No.-288)
60
7600
456000
Mild steel of iron in plain work such as reinforced concrete/ brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage and hooks and authorised over lapping shall be measured. S.I. No. 504
36.5
5600
204400
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 1st year (@0 % of total work amount S.No.1-7)
1
-
-
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 2nd year (@0.25 % of total work amount S.No.1-7)
1
6475
6475.5
Maintenance Charge including @ Earth work , repair of painted surface, earthwork on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 3rd year (@0.50% of total work amount S.No.1-7)
1
12951
12951
Maintenance Charge including @ Earth work ,repair of painted surface,earthwork on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 4th year(@0.75% of total work amount S.No.1-7)
1
19426
19426.5
Maintenance Charge including @ Earth work ,repair of painted surface,earthwork on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 5th year (@1.00% of total work amount S.No.1-7)
1
25902
25902