Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date19 Dec 2024
Closing Soon26 Dec 2024
Tender Amount₹ 15,06,632.2 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing & Laying concrete for plain/reinforced concrete (M-10) in open foundations complete as per drawing and technical specifications clauses 802,803,1202 & 1203.

9

5410

48690

... More
Providing Concrete for Plain/reinforced concrete in open foundation complete as per drawing and technical and specification clauses 802,803,1202&1203 Ch, 5, SI No. 288(i)

44

10070

443080

... More
Providing and laying reinforced cement concred in superstracture as per drawing and techenical specification clauses 802, 803, 1202 & 1203 Ch, 5, SI No. New Item (a)

64

6500

416000

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002,1005,1010 & 1202. Ch. 10 SI No. 504

51

6240

318240

... More
Providing pressure relief 100 mm dia PVC pipes.SOR No. Ch 01(xxxii)

19

220

4180

... More
Providing and laying of Filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification Clause 1204.3.8

40

3200

128000

... More
Providing and laying boulder apron for bed protection with stone boulder of minimun size and rate as per table 1300.1 no. fragment weighing not less than 25 kg laid dry complete as per drawing and technical specifications clause 1301.

17

2900

49300

... More
The routine maintenance of above box culvert work including maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1 year maintinence cost (0%)

1

-

-

... More
The routine maintenance of above box culvert work including maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd Year maintinence cost (0.25% Construction Cost)

1

3712

3712.9

... More
The routine maintenance of above box culvert work including maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd Year maintinence cost (0.50% Construction Cost)

1

7425

7425.9

... More
The routine maintenance of above box culvert work including maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th Year maintinence cost (0.75% Construction Cost)

1

11138

11138.8

... More
The routine maintenance of above box culvert work including maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th Year maintinence cost (1.00% Construction Cost)

1

14851

14851.8



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.