If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date10 Feb 2025
Closing DateCancelled
Tender Amount₹ 33,85,000
Costs
EMD
₹ 3,38,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEALD_1004207_37Tender No
229/10 COMM A PRJ CIRCLE/2025 Dt 10-01-2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
WBM Grading - II Providing, laying, spreading and compacting stone aggregates of specific sizes to Water Bound Macadam Grading-2 specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 80-100 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density complete in all respect as per MORD Technical Specification Clause 405 & as per direction of Engineer-in-charge.
196.88
2870
565045.6
... More
WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to Water Bound Macadam Grading-3 specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 80-100 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density complete in all respect as per MORD Technical Specification Clause 405 & as per direction of Engineer-in-charge.
196.88
3043
599105.84
... More
Brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class M-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and T&P etc.complete in all respects and as per direction of Engineer-in-charge.
0.7
69500
48650
... More
Providing and applying Primer Coat with bitumen emulsion SS1 grade on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means complete in all respect as per MORD Technical Specification Clause 502 & as per direction of Engineer-in-charge.
2625
41
107625
... More
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.3 kg per sqm on the prepared bituminous surface cleaned with mechanical broom complete in all respect as per MORD Technical Specification Clause 503 & as per direction of Engineer-in-charge.
2625
16
42000
... More
Providing, laying and rolling of open graded premix carpet of 20 mm thickness composed of 2/3 part 13.2 mm approved stone grit (100% passed from 22.4 mm sieve and retained on 11.2 mm sieve) & 1/3 part 11.2 mm approved stone grit: (100% passed from 13.2mm sieve and retained on 5.6 mm sieve) using bitumen VG-10 @ 1.46 kg/sqm to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable hot mix plant of appropriate capacity, laying and rolling with a smooth wheeled roller, finished to required level and grades complete in all respect as per MORD Technical Specification Clause 506 & as per direction of Engineer-in-charge.
2625
165
433125
... More
Providing and laying seal coat Type C sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using 6.7 mm size approved stone grit (100% passed from 9.5 mm sieve and retained on 2.36 mm sieve) and bitumin binder VG-10 @ 0.65 kg/sqm laying and rolling with a smooth wheeled roller, finished to required level and grades complete in all respect as per MORD Technical Specification Clause 508 & as per direction of Engineer-in-charge.
2625
64
168000
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work complete in all respect as per MORD Technical Specification Clause 305 & as per direction of Engineer-in-charge.
8.25
60
495
... More
Supply & laying of 350 mm dia NP-3 HP Culvert complete in all respect as per MORD Technical Specification Clause 1101 & as per direction of Engineer-in-charge.
7.5
1190
8925
... More
The Maintenance Cost will be provided for five years @7.50 percent.
(The Maintenance Cost will be calculated as per actual executed construction cost at the time of final bill)
1
-
-
... More
1st Year Maintenance Charges @ 0.00 % of BOQ Cost
1
-
-
... More
2nd Year Maintenance Charges @ 0.75 % of BOQ Cost
1
23566
23566
... More
3rd Year Maintenance Charges @ 1.50 % of BOQ Cost
1
47132
47132
... More
4th Year Maintenance Charges @ 2.50 % of BOQ Cost
1
70698
70698
... More
5th Year Maintenance Charges @ 3.00 % of BOQ Cost
1
94264
94264