If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date7 Jan 2025
Closing Date20 Jan 2025
Tender Amount₹ 3,85,00,000 
Notes
Download

Costs

Summary

Widening And Strengthening Work Of Old Safipur Road. (with 05 Years Maintenance)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density..(Including Labour Cess And Excluding G.S.T.)

1023

4010

4102230

... More
Providing, laying, spreading and compacting graded stone aggregateCement @1%, Bitumen Emulsion @3.50% to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.(Including Labour Cess And Excluding G.S.T.)

500.4

8350

4178340

... More
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including Labour Cess And Excluding G.S.T.)

13395

11

148684.5

... More
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Including Labour Cess And Excluding G.S.T.)

530.83

13720

7282987.6

... More
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (Including Labour Cess And Excluding G.S.T.)

2078

55

114290

... More
Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering as per drawing and technical speficiations ..(Including Labour Cess And Excluding G.S.T.)

44

7280

320320

... More
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days..(Including Labour Cess And Excluding G.S.T.)

293

5950

1743350

... More
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. .(Including Labour Cess And Excluding G.S.T.)

62

71950

4460900

... More
Furnishing and placing reinforced cement concrete M-30 in super/Sub structure as per drawing and Technical Specifications.Including Labour Cess And Excluding G.S.T.)

215

7955

1710325

... More
Furnishing and placing reinforced cement concrete in super structure as per drawing and Technical Specifications.M-20 Grade(Including Labour Cess And Excluding G.S.T.)

403

7420

2990260

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification. .. .(Including Labour Cess And Excluding G.S.T.)

30

3710

111300

... More
Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets .(Including Labour Cess And Excluding G.S.T.)

30

7150

214500

... More
Dismanteling Brick Work Or stone work in lime or cement mortar and including stacking of materials as directed by Engineer-In-Charge With in a distance of 60 meters (200)ft.(Including Labour Cess And Excluding G.S.T.)

369

498

183762

... More
Dismanteling Reinforced Cement Concrete or Reinforced Brick Work and including stacking of materials as directed by Engineer-In-Charge With in a distance of 60 meters (200)ft)ft.(Including Labour Cess And Excluding G.S.T.).T

3.97

1122

4454.34

... More
Maintenance Cost for 5 Years from the Actual Date of Complition. Ist Year Mantenance Amount will be Zero II nd Year @ 0.25%

35020052

-

87550.13

... More
III rd Year @ 0.50%

35020052

-

175100.26

... More
IV th Year @ 0.75%

35020052

-

262650.39

... More
V th Year @ 1.00%

35020052

-

350200.52



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.