Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date30 Oct 2024
Closing Date7 Nov 2024
Tender Amount₹ 8,00,000
Costs
EMD
₹ 80,000Document Cost
₹ 766Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMBD_969965_3Bid Award Id
ViewTender No
2483/E-Tender/24-25 Dated 14-10-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finish to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508 including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
2400
154
369600
... More
Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
2400
58
139200
... More
Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits not exceeding 1/2 meter(20") depth and earth work in embankment to be in 20 cm. (8") layers including ramming and dressing the surface to required levels and slopes and also including 1.50 M(5ft.) lifts and 30M (100ft.) lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with in 30M(100ft.) distance as directed by the Engineer-in-charge but excluding GST (SI. No. 253A Ch-4) including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
354
110
38940
... More
Maintenance of road for next five year after completion contractor shall be paid total maintenance cost 15% of Civil Cost for five year in the form of instalment as below. The payment shall be inclusive of cess but excluding GST payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor (Including cess and Excluding GST)
For 1st Year 0.00%
656772
-
-
... More
Item No. 11 but for 2nd year 1.5%
656772
-
9851.58
... More
Item No. 11 but for 3rd year 3.0%
656772
-
19703.16
... More
Item No. 11 but for 4th year 4.5%
656772
-
29554.74
... More
Item No. 11 but for 5th year 6.00%
656772
-
39406.32
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements